Original source · versioned page text
RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2)
The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPage 3 1 INTRODUCTION The water quality treatment for the proposed development includes a proposed bio-retention basin. This document provides an overview of the maintenance requirements for the bio- retention water quality device(s) on site to ensure that they are properly maintained. 2 GENERAL Bio-retention basins are vegetated areas where runoff is filtered through a filter media layer (e.g. sandy loam) as it percolates downwards. It is then collected via perforated underground drains and flows to downstream waterways or to storages for reuse. Bio-retention basins operate by filtering stormwater runoff through densely planted surface vegetation and then percolating runoff through a prescribed filter media. During percolation, pollutants are retained through fine filtration, adsorption and some biological uptake. The vegetation in a bio- retention system is a vital functional element of the system providing a substrate for biofilm growth within the upper layer of the filter media. The proposed bio-retention basin within the site will do much of the same. It has been designed to reduce the impact of the development on the downstream waterway environment. 3 RESPONSIBILITY FOR INSPECTION The principal involved consultancy will be required to appoint an appropriately qualified consultant maintenance contractor to carry out the inspections of the bio-retention basin during the construction and on-maintenance period. At the completion of the maintenance period the responsibility to undertake the inspections and generally maintain the basin will be shifted to Body Corporate. 4 DATA COLLECTION / STORAGE REQUIREMENTS Inspection records will be required for comparison of the performance of the system. In order to assist this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared by Healthy Waterways (2006) be adopted for the site. Refer Appendix A for a copy of the checklist. Copies of the completed checklist are to be forwarded to the Morgan Consulting Engineers (or other consultant nominated by the Principal) and to be provided to Council at the expiry of the maintenance period and on request thereafter. 5 MAINTENANCE PROCEDURE 5.1 General Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention basin and a strong healthy growth of vegetation is critical to its performance. Therefore the most intensive period of maintenance is during the plant establishment period (i.e. first two years) when weed removal and replanting may be required. Bio-Retention Basin Operational Management and Maintenance Guideline
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.