26 July 2019
MVI/mi
Sunshine Coast Office
Dear Shane,
RE: RACV NOOSA 143 NOOSA DRIVE, NOOSA HEADS
APPLICATION NUMBER 2006/1395
ADG has been requested to address the current conditions regarding stormwater management.
The current approval references the Callaghan & Toth “Stormwater Quality Management and Assessment
Report” dated June 2007. Since the issue of this report, various stormwater quality standards have been
updated. Current standards include using the current version of the MUSIC modelling software to address
correct pollutant loading and treatment train effectiveness.
We recommend the following changes to conditions:
Condition 48
Wording: Development is required to issue a Stormwater Management plan suitable to
address current council and state planning policy requirements for stormwater treatment prior
to council assessment of Operational Works application.
Reasoning: The report nominates superseded standards and requirements. Timing allows
council to assess the stormwater quality objectives prior to acceptance of detail design of the
Operational Works
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / TOOWOOMBA / DARWIN / PERTH ABN 63 131 876 143
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Condition 50
Wording: All developed surface catchments are to be captured and treated for required quality
objectives
Reasoning: Specifies the area requiring treatment, not the entire surface area of the
allotment. Detention requirements can be conditioned, but due to the tidal nature of the
receiving waterbody, there is no benefit of detaining discharge to the local or regional
catchments.
Condition 51 + 52
Condition to be removed
Reasoning: Changes to code requirements and actual requirements will be covered and
assessed under the revised condition 48
The following conditions to remain as stated:
49
50
53
Yours sincerely
ADG ENGINEERS (AUST) PTY LTD
MICHAEL VAN ITALLIE
Team Lead - Civil
22366 L001 26.07.2019.docx Page 2 of 2
Used in these records
Attachment 4 - Advice from ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 115 KB (small file)
- File type
No other editions are linked here.