Council archive · source document
MCU21 0146 Stockwell_Information Request Response Letter · MCU21/0146
7. Issue Further information and / or amendments are required in relation to access and manoeuvrability Information Required 7. Provide a widened access driveway to satisfactorily accommodate the swept path of the design vehicle, with the clearance envelope of the design vehicle remaining within the driveway and clear of kerb lines. 8. Ensure opposing cars clear of each other moving to/from the driveway and to/from the top of the basement ramp. 9. Provide modified ramp grading details in accordance with the requirements of AS/NZS 2890.1-2004, including with the grading being measured along the inside of the curve at the base of the ramp. 10. Provide further clarification If a gate is to be proposed to secure the basement carpark where will it is satisfactorily located, and how will it be satisfactorily activated? Response Refer to attached Traffic Engineer's cover letter and updated report and swept path drawings. 8. Issue There are a number of issues with the proposed management of stormwater quantity as noted below: ¢ The development proposes only 14m? of detention storge to mitigate the impacts, which is only 4% the size expected for this type of land use change e The analysis does not consider climate change ¢ The development relies on the extended detention depth within the bioretention basins for mitigating peak flow impacts. This volume is generally excluded from such analysis due to the extended time that water is held in this zone (and risk that the volume will not be available/empty to mitigate peak flows when the design event occurs) ¢ The model results show almost no change between pre-development and developed (unmitigated) peak flows from the site for the 1%AEP and 2%AEP events, even though very significant changes in imperviousness occurs « The sketch designs in Appendix C do not clearly show the detention system referred to in the report e Nosections are provided showing the interaction between bioretention and detention systems/storages ¢ There is no comparison of the pre-development or developed (un-mitigated) model results to rational method estimates. This would highlight the above discrepancy in the 1% and 2%AEP model results ¢ The use of ensemble temporal patterns is not discussed and results are provided for a single duration rather than a range of durations. ¢ Part of the site discharges by kerb adaptor to Hoffman Drive. No analysis is provided showing that Hoffman Drive has capacity for these flows. The preference would be for no new kerb adaptors. DsfeNE-KaoN UE = | eestor iammtaU oe TAN ca a aon acNa Ca aNTE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21 0146 Stockwell_Information Request Response Letter.pdfRelated documentApplication case desk ↗
About this file
- File size
- 799 KB (small file)
- File type
No other editions are linked here.