6.2.1.4 Catchment Split
Total land use to the bio-retention basin and the catchment breakdown is shown in the table below.
Table 11 - MUSIC Model Catchments
Roof (ha) Road (ha) Landscape (ha)
Catchment
100%FI 100%FI 0% FI
Site 0.1763 0.1647 0.0190
Bypass - 0.0140 0.0410
The proposed setback has resulted in an area of bypass however as shown below the basin is sized to
compensate for these flows.
6.2.1.5 Proposed Treatment Train
A treatment train consisting a rainwater tank and a conventional bioretention system, is proposed for the
development. The proposed bioretention system is proposed to be located within the proposed detention basin.
The figure below summarises the proposed treatment train for the development.
Figure 2 – MUSIC Model Layout (Bio-Retention)
6.2.1.6 Proposed Treatment Devices
Rainwater Harvesting Tanks
The following table summarises the individual parameters used in the MUSIC model for the proposed rainwater
tanks.
Table 12 - Rainwater Tanks
Properties Rainwater Tank
Volume (kL) 5
Surface Area (m²) 3.2
Initial Volume (kL) 1
Daily Demand (kL/day) 2
BR210522_SBSMP_Rev5.docx Page 15 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.