Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment D amended SWMP

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

8        Conclusion
A concept stormwater management plan has been prepared to manage stormwater quantity and quality for the
proposed development.
An on-site stormwater detention basin is proposed for the development that allows for both current and future
climate change conditions.
A stormwater quality treatment train consisting of one conventional bioretention system and a rainwater tank is
proposed for the development. It is proposed that the bioretention system will be installed within the detention
basin.
Runoff from the external catchment will be piped (up to and including 1% AEP design flows) through the
Development Area and will bypass both the proposed detention basin and treatment train.




 BR210522_SBSMP_Rev5.docx                                                                                Page 20 of 25
Log in to download the original file

Attachment D amended SWMP.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.