Original source · versioned page text
Attachment D amended SWMP
Original PDF page 33, section 1. The text section number identifies this passage in the reader.
NOOSA PLANNING SCHEME – WATER QUALITY AND DRAINAGE CODE
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
AO4.2
Where infrastructure is located on private land
an easement is dedicated over the
infrastructure in accordance with PSP6
Engineering Design Standards - Roads,
drainage and earthworks.
AO4.3
Any alterations or repairs to infrastructure
as a result of the development are made
at no cost to Council.
AO4.4
Development avoids stormwater inflow and
infiltration to the sewer infrastructure network.
AO4.5
Stormwater infrastructure is designed to
minimise maintenance costs and the
requirement for specialized equipment for
maintenance techniques.
PO5 AO5.1 A stormwater management plan with a
Stormwater drainage infrastructure is aligned to Stormwater drainage infrastructure avoids proposed detention system and a treatment
avoid crossing waterways, wetlands, drainage lines crossing waterways, wetlands drainage lines train has been prepared for the
and ecological important areas, or where it is and ecologically important areas or follows the development.
demonstrated this is unavoidable, disturbed areas edge of existing disturbed areas.
are reinstated and revegetated upon completion of Detailed design and construction of any new
stormwater infrastructure will be undertaken
works.. AO5.2
as per relevant Council standards.
Stormwater drainage infrastructure is co-
located with other infrastructure within a
combined utility corridor where appropriate.
AO5.3
Temporary vehicular crossings of waterways
must be designed and constructed to be
BUNNINGS NOOSAVILLE Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.