Original source · versioned page text
16-001014-115(A)
From the archive Proposal Plans 1 of 2.zip, inside Operational Works Application OPW16 /0203 - 1 of 4. File date in the archive: 2016-09-12 16:21.
g g Gg 2 FF gg F |& Jeg gs | S < SF €&] } & ol oS) 6) Ue SO
= N
STRUCTURE oO un + ma N = K ~~ “6 << =- © w = al ~ = = s i a a a\Q io a
NAME & 3] a =_ Fra} 2 Zz 2
o oS cc a a oO =
6
7 Zz Z
ws we ry we ~ 2
s is s |g z le 2 2: :
& & & eb ale 2 = 2
STRUCTURE 7 S S S 7 a [aS ble >= ple re Jee © >
? > > ? 3 4 we a\. le = Sle a
DESCRIPTION Blois a} | g/88 2/8 a\z= 2/8 e|2 3|- gEE >) §
ze ode 2k fe ae gf 8 8 ze al, fe ez aff g sl. ogi, gle ale 2 gee 7
l= la gfe sir gir OIE gg = eles Z|6 #8 wleS EIS Z\8 =\s 2/6 2/2 FF sa 7 ° ° alae o .
He =e 8 ES Ge =e gle BS] Eee =|2 5)x Flv 5) ~ El g ze =e gif ge =e &} 8) «68 CElZE =) OE
als als ols ols ols ols s/h a S|t#S ols le celts ale ols als als &lg Se ols . . . sles a 2
als BIS BIS BIS BR Be BA 3s Glee GS ols alse 3|8 ale als ae s|f se Be aR R R Bees 3 3
NOTE:
4, NOTWITHSTANDING THE STORMWATER Oto HEL
STRUCTURE LEVELS SHOWN, THE COVER 100 Fie
OR GRATE LEVEL SHALL SUIT THE (TYPICAL)
FINISHED SURFACE PROFILE. -
2, THE PIPE CLASSES HAVE BEEN 3 |
DESIGNED FOR SERVICE LOADS ONLY. r_ & -
THE CONTRACTOR SHALL ASSESS ~x| 3 [yp ™_] S
ANTICIPATED LOADS AND UPGRADE THE = 6 EI 3 ™
PIPE CLASSES IF NECESSARY IN 2 q 3 -- op
ACCORDANCE WITH AS 3725-2007. = ig g LL [ ~-- SN L Id
CRACKED PIPES WILL NOT BE ACCEPTED. led EE [
3. CONTRACTOR TO CHECK EXISTING i _ _\ |
CONNECTIONS PRIOR TO CONSTRUCTION. SI PI ‘| NI
4, SURCHARGE DURING A Q100 EVENT IS ~ SS
PICKED UP PARTIALLY DOWNSTREAM A
AND THE REMAINING CONTRIBUTES TO LY - \ EXTEND EXISTING TONSTRUCT SPLITTER MANROLE ||
OVERLAND FLOW. FLOOD WIDTHS DO RSS. CONSTRUCT 900@ APPROX. 3.8m OVER EXISTING 825 PIPE REFER
NOT EXCEED ROAD RESERVE DURING Qw H.G.L. mS FIELD INLET DRG 16-001014-119 FOR DETAIL =—1
MODELLED 0100 EVENT (TYPICAL) aa OVER EXISTING
5, DRAINAGE SYSTEM FOR STAGE 2 HAS LINE E HAS BEEN
BEEN DESIGNED TO MAXIMISE CAPTURE | DESIGNED TO CONVEY | 900D PIPE
AND MINIMISE OVERLAND FLOW DUE TO 33 L/s SURCHARGE 3 MONTH FLOW TO GPT
LARGE UPSTREAM CATCHMENTS.
pene Note event. EXISTING STAGE EXISTING STAGE
1A WORKS EXISTING STAGE_1A_WORKS 4A WORKS
PIPE SIZE mm (Class) 300 300 375 525 750 600 900 900 900 900 900 600 600 600 600 600 825, 900
BLACKMAXT | TBLACKMAXT| “IBLACK | “(BLACK (2) BLACK (2) (2) (2) (2) (2) BLACK (BLACK MAX) BLACK” "TBLACK "TBLACK” | (2) (2)
MAX) | MAX) MAX) MAX) max) | MAX) | MAX)
PIPE GRADE (%) 4.86% 4.90% | 4.06% |_ 1.09%, |_ 0.40% |_ 0.29%, |_ 0.30% 0.31% 0.50% 1.00% 0.48% 9.40% 0.40% 3.00% 3.00% 3.00%, | 5.16%, |_ 3.00%, | 4.45%, | 0.50%
PIPE SLOPE (1 in X) 20.59 20.43 | 24.76 | 91.88 "| 249.86” | 350.72 | 333.34 325.48 700.00 99.88 206.21 250.01 250.00 33.33 33.33 33.33 | 19.37 [33.32 "| 22.49 | 200.09
FULL PIPE VELOCITY (m/s) 0.80 1.61 1.61 os? | oss 1 1 0. 190 2,001.90 ty) 2.01.93 ty) | 2,011.93 4 2.63 28 2.63 |. 2.63 |. 2.63 | 0.77 | 2.40
PART FULL VELOCITY (m/s)| 25 3.08 3.20 [19 1 150 15h 1. 1 4.07 4.0 4.07 | 5.01 | 4.07 | 3.95] 2.40
91.0 90.0 87.0 86.0 89.0
ele sal sls scle sale esis eas eele ele esis sie eeJa 2 2 2 3 gle 43/8 Sale ssla asle Sela =ela ols
H.G.L IN PIPE & gle gle dels ssl sels ssle dele Ssif S/S ssl sie sje 5 z z e| 2) es sls aele gele sels sele dele Sele
W.S.E_IN STRUCTURE 1 - SOT Te ese = 7 = s 2 2/2 33 22/8 3 ss ss|S ssi
sje als age ce 8
PIPE FLOW 0.056 0.114, 0.177 | 0.108 | 0.246 | 0.492 | 0.492 0.247 0.924 sls Els e\s sls 3 0.744 0.744 0.744 | 0.764 | 0.764 | 0.409 | 1.526
(Cumecs)
PIPE CAPACITY 0.213 0.216 0.353 | 0.449 | 0.705 0.595 0.610 0.340 1.281 1.250 1311 1317 1317 1.064 1.064 1.064 1.396 1.064 3.028 1.280
AT GRADE (Cumecs)
DEPTH To VERT 2 ge Se 2 S 82 se ge Se & fe lp gle ge ea x i 88 ae ge © &&8 3g 23
= a2 a3 a2 a|S a Be =| ele 2 a|2 = AIS g Sim B/e q/e S = Ala ale Sle aja FS Als ala
INVERT LEVEL & 3&8 GR 8/8 g]8 SR SIS SE jf SiR 8 as |g 2/8 alg 3/8 8 a &|8 ge SE SE sie se ls
OF DRAIN 3 a|\s sls ss] s/s 8/8 se BF SB 28/5 s ale s ele a|e sls = Bo le ale sis sls IB ele ele
8 8 7 | a} 0 OS) BG 8 3} gs} 8 s R g 2 gs} 8 gs 68) RR]
DESIGN SURFACE 3 $ g g g g 2 s s g 2 = g gS 3 S 3 S 5 2 z 2 g 5 8
LEVEL . ests =z —ate —s] 2 {|__|
SETOUT fe #2 #8 S g/8 fg &8 sie slg £8 sls 32 ae ee a8 25 3|8
COORDINATES “= ule wf eee Eo
= 7 zg 3 3 = 5 7 s e 2 8 5 2 = 2 a 7 7 a B R Z g =
RUNNING =| 26.750 38] 25.500 gi] 12.9038] s.oo0g'| 5.9577] 4.91028 5.5072 S| 045s s 38.420 = 37.406 75.678 s 25.704 | 223372 2] eo 86.120 S| 6.844%] 12.000] 10.3736 31878] 11.7634
CHAINAGE £ & &
LINE N.S.C. REF NO. MCU15/0111 & REC15/0031
Fant [once [our SORE METREST TECROFIN Wo coeNT TAREE
sso [ay | AY | 27.06.16 AMENDMENT DETAILS Fy “| 11000 0 0120-30050 SURVEYOR: ML_SURVEYS PALM LAKE WORKS PTY STORMWATER DRAINAGE
“ATA | BF _| BF | 07.09.16 | ISSUED FOR CONSTRUCTION - PENDING COUNCIL APPROVAL 20 43 38 Leybourne Street, Chelmer QLD 4068 LTD 5 coaern
at ; RORIZONTAL Mob: 0412 744 223 E: [email protected] | ) LONGITUDINAL SECTIONS
K 7
Bic Deawacrecx| 1100 2 1 0 2 sm PROMECT Ho. ‘APPROVED y Calibre Consulting (QLD) Py Lid ‘uy SHEET 2 OF 3
40 Ee 2 —— a 43 16-001014 Mal ANDREW MCPHAIL RPEQ 6921 PALM GORE RESORT calibre Ge San Sg ts QD An 0 Sey THAWING HOUSER See
NIE VERTICAL a Telephone 07 3895 3444 Focsimile 07 3895 3400
air FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD STAGE 2 CONSULTING tau Catan istine ty Sappen Setiacont SOREL 16-001014-115 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.