Information response
Attached to the e-mail Response to Info Request, Landscape plans & amended Proposal Plans (1) - 1 of 4 - MCU16/0081.
2
ACCESS AND
EXISTING
ELECTRICAL
EASEMENT
LAYOUT PLAN
CONCEPT SITE CON05 D3 19/09/2016
ACCESS ROAD
CROSS
SECTIONS
132kV LINE PE2943-01 D 31/10/2016
PROFILE OVER
PROPOSED
DEVELOPMENT
DESIGN - - 14/06/2016
RESPONSE
PLAN
SITE PLAN - - 14/06/2016
LANDSCAPE LCP3 - 23/05/2016
CONCEPT
PLAN
CONCEPT SKC01 - April 2016
STORMWATER
MANAGEMENT
PLAN SHEET 1
CONCEPT SKC02 - April 2016
STORMWATER
MANAGEMENT
PLAN SHEET 2
2. All easement conditions must be maintained.
3. Satisfactory clearance from your proposed structure to the existing (and/or
future) electricity wires must be maintained in accordance with the Electrical
Safety Regulations 2013.
4. Detailed civil design drawings showing any proposed cut and fill levels on the
easement and the location of the Energex assets in relation to the proposed
development must be approved by Energex before any works can commence
on site.
5. No civil works are to occur within 5 metres of any part of an Energex Structure
(e.g.- tower base, pole or stay) without Energex approval.
6. Lighting structures are not permitted in the easement without prior written
consent of Energex. Lighting designs for proposed developments (e.g. road,
carparks etc) on the easement are likely to require reduced height structures.
Please submit detailed design to Energex for approval. These drawings must
clearly show the following;
Proposed height of the lighting structures and the ground level at the
structure base,
Relative (to lighting structures) ground levels at Energex structures
(towers, pole etc) either side of the lighting structures, and
Reference: HBD 5390549 346062
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.