Council archive · source document
Application Report · MCU10/2113.03
20 Peregian Esplanade, Peregian Beach PURPOSE & OVERALL OUTCOMES PROPOSAL COMPLIANCE the use of low toxic materials, natural light and cross ventilation. 4.6.2 Performance Outcomes & Acceptable Outcomes PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE Energy efficiency PO1 AO1 AO1 Development minimises energy No acceptable outcome provided The proposed development has been ☒Compliant consumption and the production of designed to minimise energy consumption ☐N/A greenhouse gas emissions. and the production of greenhouse gas ☐Performance Solution emissions. Water efficiency and stormwater management PO2 AO2.1 AO2.1 Development maximises water If for accommodation activities, a minimum The proposed development does not involve ☐Compliant efficiency on site by incorporating 3,000 litres of rain water storage is provided accommodation activities. As such, this ☒N/A rainwater collection and reuse per dwelling and reused for non-potable criterion is not applicable. ☐Performance Solution measures for non-potable purposes purposes and incorporated into a such as irrigation. stormwater management plan for the development. AO2.2 AO2.2 ☐Compliant With the exception of accommodation The proposed development does not seek to ☒N/A activities, rain water storage sufficient for change the stormwater management for the ☐Performance Solution the intended use is captured and used site. As such, this criterion is not applicable. on-site for non-potable purposes and incorporated into a stormwater management plan for the development. 100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.