Skip to the record
Every meeting, every word.

Council archive · source document

Application Report · MCU10/2113.03

of 163

Text shows just the words. Original shows the document exactly as it was published.

20 Peregian Esplanade, Peregian Beach




 PURPOSE & OVERALL OUTCOMES                                        PROPOSAL                                                                 COMPLIANCE
     the use of low toxic materials, natural light and cross
     ventilation.


4.6.2    Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                   ACCEPTABLE OUTCOMES                              PROPOSAL                                           COMPLIANCE
 Energy efficiency
 PO1                                    AO1                                              AO1
 Development       minimises energy     No acceptable outcome provided                   The proposed development has been                  ☒Compliant
 consumption and the production of                                                       designed to minimise energy consumption            ☐N/A
 greenhouse gas emissions.                                                               and the production of greenhouse gas               ☐Performance Solution
                                                                                         emissions.

 Water efficiency and stormwater management
 PO2                                    AO2.1                                            AO2.1
 Development        maximises water     If for accommodation activities, a minimum       The proposed development does not involve          ☐Compliant
 efficiency on site by incorporating    3,000 litres of rain water storage is provided   accommodation activities. As such, this            ☒N/A
 rainwater collection and reuse         per dwelling and reused for non-potable          criterion is not applicable.                       ☐Performance Solution
 measures for non-potable purposes      purposes and incorporated into a
 such as irrigation.                    stormwater management plan for the
                                        development.
                                        AO2.2                                            AO2.2                                              ☐Compliant
                                        With the exception of accommodation              The proposed development does not seek to          ☒N/A
                                        activities, rain water storage sufficient for    change the stormwater management for the           ☐Performance Solution
                                        the intended use is captured and used            site. As such, this criterion is not applicable.
                                        on-site for non-potable purposes and
                                        incorporated        into    a    stormwater
                                        management plan for the development.




                                                                                                                                                                    100

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.