20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                       ACCEPTABLE OUTCOMES                              PROPOSAL                                           COMPLIANCE
                                            b) installing protective fencing around the
                                                dripline of vegetation; and
                                            c) ensuring stock piling, storage and
                                                vehicle parking occur outside the areas
                                                of vegetation to be retained.
                                            AO12.6                                           AO12.6                                             ☐Compliant
                                            Where clearance of habitat is unavoidable,       The proposed development does not involve          ☒N/A
                                            once the area disturbed by the works is          new roads. As such, this criterion is not          ☐Performance Solution
                                            re-established, replacement habitat is           applicable.
                                            planted in proximity of the works to create
                                            native fauna habitat suitable for the area and
                                            maintained for the life of the works.
 PO13                                       AO13                                             AO13                                               ☐Compliant
 Road infrastructure is constructed to      Road infrastructure is constructed in            The proposed development does not involve          ☒N/A
 minimise     adverse     environmental     accordance with Council’s Planning Scheme        new roads. As such, this criterion is not          ☐Performance Solution
 impacts, including from run-off and        Policy PSP6 Engineering Design Standards–        applicable.
 erosion.                                   Roads, drainage and earthworks
 External Works and Infrastructure
 PO14                                       AO14                                             AO14                                               ☐Compliant
 Development is provided with external      Where not already existing, the following        The proposed development does not involve          ☒N/A
 works—                                     infrastructure components are provided at        amendments to the approved frontage of the         ☐Performance Solution
 a) along the full extent of the frontage   the frontage of the site—                        site. As such, this criterion is not applicable.
     of the site to an appropriate          a) full width sealed road;
     standard having regard to the          b) concrete kerb and channel where
     specified function of the road; and         appropriate;
 b) provided beyond the site’s frontage     c) forming and grading to footpaths;
     if required.                           d) vehicular kerb and footpath crossings;
                                            e) a constructed bikeway;
                                            f) a constructed footpath;
                                            g) a constructed carriageway;
                                            h) required alterations to public utility
                                                 mains, services or installations;



                                                                                                                                                                        115

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.