20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                       ACCEPTABLE OUTCOMES                              PROPOSAL                                   COMPLIANCE
                                                 i)   more than 1m²; or
                                                 ii)  storing wet waste; or
                                                 iii) storing other waste with a high
                                                      potential to cause pollution if
                                                      washed or leaked from the bins,
                                                      including waste oil or putrescibles.
 Safety and protection of infrastructure when demolishing or removing buildings
 PO7                                       AO7.1                                             AO7.1
 Demolition, removal, relocation or Infrastructure including reticulated water,              The proposed development can comply with   ☒Compliant
 associated works do not result in:        sewerage, stormwater, and electricity are         this outcome.                              ☐N/A
 a) 'live' or 'active' infrastructure that protected from damage and made safe to the                                                   ☐Performance Solution
    may present risk to people using the standard required by the regulatory
    site or surrounding areas; or          authority.
 b) damage to infrastructure or other AO7.2                                                  AO7.2
    works.                                 Infrastructure is disconnected, capped or         The proposed development can comply with   ☒Compliant
                                           sealed including:                                 this outcome.                              ☐N/A
                                            a) electricity meters are removed and                                                       ☐Performance Solution
                                               electrical wires disconnected;
                                            b) telephone lines are disconnected; and
                                            c) data cables are disconnected and
                                               removed.
                                           AO7.3                                             AO7.3
                                           A temporary crossing is provided to protect       The proposed development can comply with   ☒Compliant
                                           road reserve infrastructure including kerb        this outcome.                              ☐N/A
                                           and channel.                                                                                 ☐Performance Solution
                                            AO7.4                                            AO7.4
                                            Any damage to footpaths, street plantings,       The proposed development can comply with   ☒Compliant
                                            natural vegetation, kerb and channel, bridges    this outcome.                              ☐N/A
                                            or roadways at the removal site, the new site                                               ☐Performance Solution
                                            or between the sites is repaired or reinstated
                                            to at least pre-existing conditions.




                                                                                                                                                                121

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.