20 Peregian Esplanade, Peregian Beach




 PURPOSE & OVERALL OUTCOMES                                          PROPOSAL                                                         COMPLIANCE
h) Hydrologic regimes are maintained to pre-development
   conditions to maintain waterway stability, protect ecology and
   groundwater dependent ecosystems, maintain suitable fish
   passage, and mitigate flood risk to people and property; and
i) Development is designed, constructed and operated to facilitate
   erosion and drainage control and avoid release of prescribed
   water contaminants into receiving waters.


4.9.2    Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                       ACCEPTABLE OUTCOMES                        PROPOSAL                                       COMPLIANCE
 Stormwater drainage design                 AO1                                        AO1
 PO1                                        A stormwater management plan is            The proposed development does not intend to    ☐Compliant
 The development and its stormwater         prepared     consistent  with   PSP6       change the existing stormwater management      ☒N/A
 management system is planned and           Engineering Design Standards - Roads,      for the site. As such, this criterion is not   ☐Performance Solution
 designed having regard to:                 drainage and earthworks.                   applicable.
 a) the natural features of the site;
 b) the need to avoid impacts and
     potential risks to ecologically
     important areas;
 c) the likely effectiveness of erosion
     and    sediment     control      and
     stormwater drainage measures
     during rainfall events during and
     post construction; and
 d) the need to protect environmental
     values and water quality of
     receiving waters both during and
     post construction.
 PO2                                        AO2.1                                      AO2.1
 Stormwater drainage infrastructure is      Stormwater drainage planning, design and                                                  ☐Compliant



                                                                                                                                                              124

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.