Skip to the record
Search everything, all in one place.

Council archive · source document

132003.221172.6 Change to Existing Approval Notice · 132003.221172.7

Attached to the e-mail Changes form. owners consent, approved plans, copy of change approval - 132003.221172.7.

of 11

Text shows just the words. Original shows the document exactly as it was published.

                                                                               132003.221172.6

6    APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the
following tables:

Approved Plans

Plan No.     Issue     Plan / Document Name                                 Date
SD.101       P7        Views drawn by Ian Gorton Design                     Feb 15
SD.201       P7        Floor Plans drawn by Ian Gorton Design               Feb 15
SD.501       P7        Elevations & Section drawn by Ian Gorton Design      Feb 15

7    PLANS/DOCUMENTS REQUIRING AMENDMENT

Not Applicable

8    ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Building is to comply with the Building Code of Australia Section C Fire Resistance in
      regard to distances or protection required.
2.    Payment via credit card transaction will not be an acceptable method of payment for
      development contributions conditioned in this permit.
3.    The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder
      from making noise from:-
      3.1. Monday to Saturday, before 7:00am or after 6:30pm
      3.2. Sunday or public holiday, at any time.
      A maximum penalty of $1,500 applies to an offence under these provisions.
4.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
      paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be
      placed where it could reasonably be expected to move into a roadside gutter,
      stormwater drain or a water course. On the spot fines apply for such offences.
5.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991
      Act if the cost of operational works exceeds $80,000, then a portable long service levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to
      sight the approved form issued by the Building and Construction Industry (Portable Long
      Service Leave) Authority that confirms that the requirements of the Act have been
      satisfied. A statutory declaration outlining the cost of the operational works must be
      submitted to Council with the lodgement of any application for operational works over
      the site.
6.    We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their
      responsibilities under the Disabled Discrimination Act (DDA) in regard to the installation
      of disabled access and the provision of disabled facilities, and that access to this
      building and the provision of sanitary facilities may need to comply with the requirements
      of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia.




                                                                                 Page 8 of 11

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

132003.221172.6 Change to Existing Approval Notice.pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.