Site Classification Report

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 Notes
Levels shown are
approximate and are sourced
from local council mapping                                                                                                                                                                                                  N
or information provided by
the client. These levels are
                                                                                                                                                                                 93m
solely to demonstrate the
functionality of the system.
Actual floor height is to be
                                                       Proposed Sub-Surface




                                                                                                                         10m
confirmed with the builder
                                                       Irrigation Area - 240sqm
prior to installation.
                                                       (20 x 12m)
All pipe work from the
                                                       (Approx RL 68)
structure to the proposed
system should be covered
and adequately vented and                                                                                    BH7
                                                                                                             PT3       Slope 20%            BH6
be vermin/insect proof.                                                                       Reserve Area
                                                                                                                                            PT2
All work carried out should
meet relevant
codes/standards and be done
by an appropriately qualified
and licensed person.                                                                                                           BH5
Proposed system should be                                                                                                      PT1
constructed in a way to                                                                                                                                                                   10-30m
maximize evapotranspiration                                                                                                     22                                                        Trees
                                                                                                                                     m
and minimize potential
pooling and runoff.
If plans were not available at
the time of investigation                                                                                                                         TP3                   Slope 27%
further reporting and design
work may be needed prior to
council submission and
installation.                                                                                                 10-30m
Care is to be taken not to                                                                                    Trees                                            TP2           Slope 27%
compact,smear or damage
the soil structure during                                                                                                                                                                       10-30m
                                                                                      Slope 12-16%
                                                                                                                                                           Ridgline                             Trees
installation (This can lead to
                                                                                                   TP4                                                                        TP1
premature failure).
If structures have been built
since our initial investigation
(Including neighboring
structures) please contact us
to confirm this will not                                                                                                                 10-30m
adversely effect the design.                                                                                                             Trees
Final landscaping and
installation should discourage
and limit causal pedestrian
access.(By way of plantings,
border, mounds, visual and
or physical deterrents)
The owner should obtain
knowledge on how to use
and maintain the proposed
system. Most of this is                                                           Proposed Shed              Proposed Advanced                       Proposed Residence
available from your chosen                                                        (Approx RL 65)             Secondary ASTP                          (Approx RL 81)
supplier/installer.                                                                                          (Approx RL 68)
This report must be
approved by the local council
prior to any work
commencing.
The effluent disposal
report must be
accompanied by a Site
Classification Report. If
the Site Classification is
H1,H2, E or P an
articulation joint will need
to be designed by a
person licensed to do so.

Client- Sarah Waller Architecture
Site - 178 Davis Road, Cootharaba
                                                                                                                                                                                                           Ground Drill Pty Ltd
Date - 22/06/2
                                                                                                                                             Abbreviations                                                 Sunshine Coast, QLD.
Job# - 22/237
                                                                                                                                             BH : Borehole            DCP : Dynamic Cone Penetrometer      QBCC # 150 345 80
Scale - 1 : 900 @ A4 (Site features are approximate-Do not scale)
                                                                                                                                             PT : Percolation Test    HD : Heavy Droplet Lilac Sprinkler   E: [email protected]
                                                                                                                                             TV : Turf Valve          RWT : Rain Water Tank                W: www.grounddrill.com.au
                                                                                                                                                                                                           P: 0407 035 220
Log in to download the original file

Site Classification Report.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.