Original source · versioned page text
Compiled Plans & Documents OPW18-0342 02
Original PDF page 180, section 1. The text section number identifies this passage in the reader.
2023 Ecological Management Plan — Grasstree Court — Lot 9 ATTACHMENTS Figure B1 — Receiving Site Landscape (A — 2018 aerial and B — 2023 aerial) Figure B2 — Receiving Site Treatment Areas (original survey 2018) Figure B3 — Transport Route Figure B4 — Receiving Site Set-out Appendix B1 — Capping Specifications Appendix B2 - Monitoring Sheet — Rehabilitation 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.