Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Compiled Plans & Documents OPW18-0342 02

of 192

Page text read automatically using OCR, there may be inaccuracies

                                                              Retirement Living & Aged Care Facility
                                                                     Grasstree Court, Sunrise Beach

9.2         Ongoing Operational Recommendations
These recommendations must be satisfactorily built in to the relevant operational procedures
adopted for the approved facilities, ensuring they are carried out in perpetuity to ensure ongoing
bushfire risk management is addressed appropriately.

1. Provide a copy of this report to the operational management teams of the facilities and ensure
   a copy is held on premises for ease of future reference.

2. Ensure the each of the bushfire emergency provisions documents are integrated into the overall
   emergency plans for each facility, ensuring these provisions are updated on a regular basis.

3. Implement the staff and resident training and exercising measures identified in each of the
   bushfire emergency provisions for the RAC and the retirement living facility.

4. Manage vegetation across the site in accordance with measures identified at Section 7 of the
   report.

5. Undertake regular (twice yearly at a minimum) inspections of landscaped areas across the site
   and maintain in a low fuel condition as set out at Section 7 of this report.

6. Ensure access to the strategic fire trail network servicing Noosa National Park is not inadvertently
   hindered by any ongoing activity associated with the approved development, and notify
   Queensland Parks and Wildlife should any notable issues arise relating to the accessibility of, or
   ongoing use of its trail network is observed.

7. Maintain the identified asset protection zones across the site in a low fuel condition, and
   permitting vehicle access to all asset protection zones.

8. Ensure the buildings across the site are maintained, with wear and tear repaired and in working
   order, in perpetuity.

9. Ensure the on-site fire access network, comprising 4m wide trafficable tracks within a 5m wide
   trail (including emergency egress tracks) are maintained year-round.




Status: Final                                                                                 March 2019
Project No.: 18-030                                                                              Page 41

Log in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.