Original source · versioned page text
Compiled Plans & Documents OPW18-0342 02
Bushfire Buffer (13.5m) 7 7 7 BAL-29 Contour (20m) -/ BAL-19 Contour (30m) BAL-12.5 Contour N\ | 4 N 1. This bushfire management plan is to be read in conjunction with the bushfire hazard assessment report prepared by Meridian Urban and dated December 2018. 2. The rear facade and the entirety of the roof structure of the residential aged care facility is to be constructed to BAL-29 requirements. The southern, eastern and western facades are to be built to BAL-19 requirements, on the basis of building shielding pursuant to AS3959. 3. All vegetation across the site is to be managed in a low-fuel condition in perpetuity in accordance with the bushfire hazard assessment report prepared by Meridian Urban dated December 2018. BAL Construction Contours BAL-12.5 wa BAL- 19 A Sunrise Beach BAL V1 BAL-29 ; o om @ Bushfire Buffer ee Scale 1:1 - Lengths are in Meters ORIGINAL SIZE AL Description SBC / ITB Drawn LG Checked 10/12/2018 Date Legend | Cadastre | Fire Vehicle Track — Development Layout BUSHFIRE MANAGEMENT PLAN PROJECT: 5950 - Sunrise Beach é j 6 / LOCATION: Sunrise Beach, Queensland - North Meridian CLIENT: Meridian Urban U rb an Brisbane | Sydney Horiz. Datum: MGA Zone56 Drawn: 10 December 2018 meridianurban.com Vert. Datum: Australian Height Datum Surveyer: Scale: 1:300 Sheet: 1of2 Local Authority: Shire of Noosa Contour Interval: 1m Drawing no: 1 Revision:
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.