6. Noosa River DMP Ver0 (Combined)

of 392

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 118, section 1. The text section number identifies this passage in the reader.

                                     Requesting Endorsement of Sediment Sampling and Analysis Plan
                                           BMT (OFFICIAL)



2.2 Noosa River
Council proposes to undertake an ‘adaptive’ approach to nourishment within the proposed dredge and
placement area (Figure 3.2). Previous campaigns have focussed on erosion hotspots, however these
are no longer problematic due to mobility of sand bars and the river channel. Indicative cross sections
as per previous dredge design are shown in Table 2.1 for reference. For future campaigns, works of a
similar design and extent works will be undertaken with the proposed dredge and placement extent, to
protect existing assets and maintain the foreshore as needed.

The proposed seaward extent of the dredge area has been extend to -2.5m (AHD), or up to 50m from
the adjacent Fish Habitat Area – Management Area A (whichever comes first).

On an annual basis, typically a total of 5000 - 7000 m3 will be dredged and placed within the proposed
dredge area. The placement areas typically range from LAT (-0.42m AHD) to + 1m AHD. Dredge
material will be taken from areas below LAT (-0.42m AHD) to a maximum dredge depth of -2.5m AHD
(or as stated above to within 50m of the adjacent FHA).

Dredging works will be undertaken via cutter suction dredge with delivery of sand to the adjacent
placement areas via a slurry pipeline.

The selection of dredge and placement sites will be undertaken on an annual basis. There are currently
no updated designs for future dredging and placement works.




A10342 | 002                                       9                                    15 November 2021
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.