Original PDF page 123, section 1. The text section number identifies this passage in the reader.

                                        Requesting Endorsement of Sediment Sampling and Analysis Plan
                                             BMT (OFFICIAL)




3 Sampling and Analysis

  ̶
3.1 Sampling Rationale
NEPM does not provide guidance regarding number of samples to be collected and sampling methods
for the assessment of marine sediments. On this basis, sample numbers and the sampling design
followed NAGD. Appendix D of the NAGD sets out the minimum number of sampling locations based
on the volume of potentially contaminated material to be dredged.

The sampling and analysis approach outlined below aims to characterise physical and chemical
characteristics of dredge material for the total dredge area (composite cores). This assumes at both
sites material is well mixed, from a highly active system, of recent deposition.

3.2 Number of Sampling Locations
Based on guidance provided in Appendix D of NAGD a total of 17 primary sites will be sampled at the
Spit and 6 primary sites at the River (site locations shown in Figure 3.1 and Figure 3.2). An additional 4
sites will be sampled in the proposed River dredge/placement area, to assist with physical
characterisation of the material (as works are adaptive rather than fixed).

The number of sample locations is based on the total dredge volume, as from an operational
perspective, all dredged areas will be treated as a single dredge unit.

Table 3.1 Total Dredge Volumes
Site                      Volume (m3)                          Recurrence
Spit                      83,000                               Single
River                     5000 - 7000                          Annual



Core lengths range between 0 to 3m for the Spit sites, and 0 to 2m at the River sites Table 3.2).




A10342 | 002                                        14                                    15 November 2021
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.