Original source · versioned page text
6. Noosa River DMP Ver0 (Combined)
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 133, section 1. The text section number identifies this passage in the reader.
Requesting Endorsement of Sediment Sampling and Analysis Plan
BMT (OFFICIAL)
Level of Level of
NAGD or other
Parameter Target PQL NEPM (mg/kg) Investigation Investigation
Screening Level
(Spit) - Pilot (River)
Total Phosphorus 1 - -
as P
Nitrate and Nitrite 0.1 - -
as N
Ammonia as N 0.2 4 -
Total Petroleum
Hydrocarbons
(mg/kg)
C6-C9 100 - -
C10-C14 100 - -
20% of Primary 50% of Primary
C15-C28 100 - -
Sites (3) Sites (3)
C29-C36 100 - -
C10-C36 (sum) 100 550 -
BTEXN (mg/kg)
Benzene 0.2 - -
Toluene 0.2 - - 20% of Primary 50% of Primary
Ethylbenzene 0.2 - - Sites (3) Sites (3)
Xylene 0.2 - -
Organometallics
MBT, DBT, TBT 0.5 μg Sn/kg 9 μg Sn/kg - 20% of Primary 50% of Primary
Sites (3) Sites (3)
Organics
(mg/kg)
Napthalene 5 - -
2- 5 - -
methylnapthalene
acenapthalene 5 - -
(acenapthene 5 - -
Fluorene 5 - -
Phenanthene 5 - -
20% of Primary 50% of Primary
Anthracene 5 - - Sites (3) Sites (3)
Benz[b]fluoranthe 5 - -
ne
Fluoranthene 5 - -
Indeno[1,2,3- 5 - -
cd]pyrene
Benzo[k]fluoranth 5 - -
ene
A10342 | 002 24 15 November 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.