Original source · versioned page text
6. Noosa River DMP Ver0 (Combined)
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 137, section 1. The text section number identifies this passage in the reader.
Requesting Endorsement of Sediment Sampling and Analysis Plan
BMT (OFFICIAL)
• Data validation objectives - All laboratory analyses will be validated in accordance with Appendix A
of NAGD (which are specific to marine sediments) to confirm suitable data quality for undertaking a
rigorous characterisation of the proposed dredge material. This will involve an assessment of the
following:
- Sample holding times and storage conditions
- Laboratory blanks, duplicates and surrogate/matrix spikes
- Field triplicates samples, triplicate sample splits and trip blank.
• Completeness objective - At least 95% of all data received should be validated as suitable for use.
• Chain-of-custody form objectives – completed forms shall accompany the samples.
• Laboratory sample receipt objectives – the laboratory shall provide written confirmation on whether:
the sample names/numbers received agree with chain-custody forms; samples were received intact;
samples were received at specified temperature; and samples were received within appropriate
holding times.
Note QA/QC statics will only be applied to metals and nutrients for the purposes of this SAP.
Table 3.4 Data Quality Objectives for Data Validation
Parameter Data Quality Objective
Holding Time Samples received within specified holding time (NAGD Appendix
H)
Field Triplicate Samples Relative Standard Deviation <50%
Triplicate Split Samples, including Relative Standard Deviation <50%
inter-laboratory samples
Laboratory Blanks At or near the Limit of Reporting (LOR)
Laboratory Duplicate Samples Relative Percent Difference (RPD) <35% or as per laboratory
requirements
Laboratory Matrix Spikes Recovery as per laboratory requirements
Surrogate Spikes Recovery as per laboratory requirements
Chain-of-custody forms 100% complete and included in SAP implementation report
Sample receipt from laboratory Sample names/numbers received agree with chain-custody forms
Samples were received intact
Samples received at specific temperature
Samples received within laboratory holding times
Completeness objective At least 95% of all data received should be validated as suitable for
use
3.11 Reporting
The reporting of sediment quality results will be undertaken in a SAP Implementation Report that
includes the following components:
• Summary of the SAP, or SAP appended to the report
• Outline of potential problems encountered and deviations from the SAP, including justification
A10342 | 002 28 15 November 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.