Skip to the record
Every meeting, every word.

Original source · versioned page text

6. Noosa River DMP Ver0 (Combined)

of 392

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 303, section 1. The text section number identifies this passage in the reader.

Page                         : 18 of 25
Work Order                   : EB2201825
Client                       : BMT COMMERCIAL AUSTRALIA PTY LTD
Project                      : A10342 - Noosa SAP

Matrix: SOIL                                                                                                                 Evaluation: û = Holding time breach ; ü = Within holding time.
Method                                                               Sample Date                 Extraction / Preparation                                    Analysis
 Container / Client Sample ID(s)                                                   Date extracted    Due for extraction     Evaluation    Date analysed    Due for analysis    Evaluation

 EP202A: Phenoxyacetic Acid Herbicides by LCMS
Soil Glass Jar - Unpreserved (EP202)
                                                                                                       07-Feb-2022                                          12-Mar-2022
   BH6 0-0.5,                                         BHS11 0-0.5,   24-Jan-2022   31-Jan-2022                                 ü          31-Jan-2022                             ü
   BHS17 0-0.5,                                       BHS5 0-0.5,
   BH4 0-0.5,                                         BH3 0-0.5
 EP231A: Perfluoroalkyl Sulfonic Acids
HDPE Soil Jar (EP231X)
                                                                                                        23-Jul-2022                                         13-Mar-2022
   BH6 0-0.5,                                         BHS11 0-0.5,   24-Jan-2022   01-Feb-2022                                 ü          01-Feb-2022                             ü
   BHS17 0-0.5,                                       BHS5 0-0.5,
   BH4 0-0.5,                                         BH3 0-0.5
 EP231B: Perfluoroalkyl Carboxylic Acids
HDPE Soil Jar (EP231X)
                                                                                                        23-Jul-2022                                         13-Mar-2022
   BH6 0-0.5,                                         BHS11 0-0.5,   24-Jan-2022   01-Feb-2022                                 ü          01-Feb-2022                             ü
   BHS17 0-0.5,                                       BHS5 0-0.5,
   BH4 0-0.5,                                         BH3 0-0.5
 EP231C: Perfluoroalkyl Sulfonamides
HDPE Soil Jar (EP231X)
                                                                                                        23-Jul-2022                                         13-Mar-2022
   BH6 0-0.5,                                         BHS11 0-0.5,   24-Jan-2022   01-Feb-2022                                 ü          01-Feb-2022                             ü
   BHS17 0-0.5,                                       BHS5 0-0.5,
   BH4 0-0.5,                                         BH3 0-0.5
 EP231D: (n:2) Fluorotelomer Sulfonic Acids
HDPE Soil Jar (EP231X)
                                                                                                        23-Jul-2022                                         13-Mar-2022
   BH6 0-0.5,                                         BHS11 0-0.5,   24-Jan-2022   01-Feb-2022                                 ü          01-Feb-2022                             ü
   BHS17 0-0.5,                                       BHS5 0-0.5,
   BH4 0-0.5,                                         BH3 0-0.5
 EP231P: PFAS Sums
HDPE Soil Jar (EP231X)
                                                                                                        23-Jul-2022                                         13-Mar-2022
   BH6 0-0.5,                                         BHS11 0-0.5,   24-Jan-2022   01-Feb-2022                                 ü          01-Feb-2022                             ü
   BHS17 0-0.5,                                       BHS5 0-0.5,
   BH4 0-0.5,                                         BH3 0-0.5
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.