Skip to the record
Search everything, all in one place.

Original source · versioned page text

6. Noosa River DMP Ver0 (Combined)

of 392

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 310, section 1. The text section number identifies this passage in the reader.

Page                  : 25 of 25
Work Order            : EB2201825
Client                : BMT COMMERCIAL AUSTRALIA PTY LTD
Project               : A10342 - Noosa SAP

Preparation Methods                             Method     Matrix   Method Descriptions
Organotin Sample Preparation                    ORG35      SOIL     In house: 20g sample is spiked with surrogate and leached in a methanol:acetic acid:UHP water mix and
                                                                    vacuum filtered. Reagents and solvents are added to the sample and the mixture tumbled. The butyltin
                                                                    compounds are simultaneously derivatised and extracted. The extract is further extracted with petroleum ether.
                                                                    The resultant extracts are combined and concentrated for analysis.
QuECheRS Extraction of Solids                   ORG71      SOIL     In house: Sequential extractions with Acetonitrile/Methanol by shaking. Extraction efficiency aided by the addition
                                                                    of salts under acidic conditions. Where relevant, interferences from co-extracted organics are removed with
                                                                    dispersive clean-up media (dSPE). The extract is either diluted or concentrated and exchanged into the
                                                                    analytical solvent.
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.