Skip to the record
Beware of cheap imitations.

Original source · versioned page text

6. Noosa River DMP Ver0 (Combined)

of 392

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 381, section 1. The text section number identifies this passage in the reader.

  Performance outcomes                                                    Acceptable outcomes                                       Response
                                                                                                                                       8. The proposed project will not result in an
                                                                                                                                          increase in pest fish species.
  PO8 Works are undertaken to encourage fish habitats                     No acceptable outcome is prescribed.                      Complies with PO8
  and fisheries resource values to naturally regenerate.
                                                                                                                                    Fisheries resource values will be allowed to naturally
  Note: Substitution of fish habitats is not supported.                                                                             regenerate.
  A condition of approval for any marine plant restoration is likely to                                                             The replenishment of sand along the Gympie
  require a post-works monitoring and maintenance program
                                                                                                                                    foreshore will provide additional habitat for the
  appropriate for the scale of the restoration works.
                                                                                                                                    establishment of marine plants (e.g. mangroves).

                                                                                                                                    Benthic communities are expected to rapidly recover.

  PO9 Development likely to cause drainage or                             No acceptable outcome is prescribed.                      PO9 NOT APPLICABLE
  disturbance to acid sulfate soils, prevents the release
  of contaminants and impacts on fisheries resources                                                                                The proposed activities will not cause drainage or
  and fish habitats.                                                                                                                disturbance to acid sulfate soils.
  Note: Management of acid sulfate soil is consistent with the current
  Queensland acid sulfate soil technical manual: Soil management
  guidelines v4.0, Department of Science, Information Technology,
  Innovation and the Arts, 2014.
  PO10 Tidal and freshwater inundation and drainage                       For bridges:                                              Complies with PO10
  patterns, extent and timing are maintained or restored
  such that ecological processes continue and                             AO10.1 Bridges are designed with abutments above          No changes to tidal or freshwater inundation and
  associated fish habitat values and condition are                        the highest astronomical tide.                            drainage patterns will result from the proposed
  maintained.                                                                                                                       activities.
                                                                          AND

                                                                          For water, sewer or stormwater infrastructure:

                                                                          AO10.2 Infrastructure is placed below the existing
                                                                          natural substrate surface level, and natural substrate,
                                                                          surface levels and habitat condition and values are
                                                                          reinstated.

                                                                          For any other development, no acceptable outcome is
                                                                          prescribed.


State Development Assessment Provisions – version 2.6
State code 11: Removal, destruction or damage of marine plants                                                                                                     Page 6 of 12
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.