6. Noosa River DMP Ver0 (Combined)

of 392

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

     INTRODUCTION

           LOCATION
The site location for dredging/nourishment works is within the Noosa River and along the southern foreshore of
the Noosa River between Hilton Esplanade and Weyba Creek (see Figure 1).




Figure 1: Site Location


           PROJECT DETAILS
Localised erosion along the Noosa River southern foreshore is occurring due to natural coastal processes and
boat wakes. The foreshore is a high value area for public use and amenity and the ongoing erosion is threatening
vegetation, parkland and infrastructure. Current approvals exist in for parts of this foreshore (Areas 1 – 6),
however erosion hotspots are changing over time and additional areas require protection with sand re-
nourishment.
The Noosaville Dredge Management Plan 2006 has been used for dredging works to date; however, this updated
management plan specifies requirements consistent with present day sediment testing (NAGD 2009) and
environmental monitoring throughout dredging activities.


3
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.