Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Activity Hazards Proposed Controls Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Failure to identify MEDIUM 5 A register and SDS’s of hazardous materials to be used on site will be in a readily accessible position to any worker on Site Management Contract
chemical site. Partner
information SDS dated within the last five (5) years will be provided as part of SWMS and a copy kept with the product on site.
Hazardous Chemicals as Defined under Schedule 14 WHS Reg 2011 -
o Acrylonitrile
o Arsenic
o Asbestos
o Benzene
o Cadmium
o Chromium
o Creosote
o Crystalline Silica
o Isocyanates
o Lead
o Mercury
o MOCA
o Organophosphate pesticides
o Pentachlorophenol (PCP)
o Polycyclic aromatic hydrocarbons (PAH)
o Thallium
o Vinyl Chloride
Failure to identify MEDIUM 5 Risk assessments for each substance (and its uses) will be carried out prior to the hazardous substances / dangerous Site Management Contract
chemical goods being brought/used onto site. Partner
information
Workers not MEDIUM 5 Personnel will be trained in the hazards associated with the hazardous substances / dangerous goods, the risk Site Management Contract
trained / licenced assessment and the correct use and maintenance of PPE. A signed training record will be recorded on Woollam Connect Partner
in the activity
Workers not MEDIUM 5 Details of instruction, training, and supervisory requirements for the use of the hazardous substances / dangerous goods Site Management Contract
trained / licenced may form part of SWMS. Training is also provided on Woollam Connect Partner
in the activity
Use Compatible MEDIUM 5 All containers and storage areas in which hazardous substances / dangerous goods are stored will be appropriately Site Management Contract
storage labelled. Partner
Explosion
Absorption or MEDIUM 6 Employers shall ensure necessary personal protective equipment (PPE) will be provided for use with the hazardous Site Management Contract
contact with substances / dangerous goods in accordance with the SDS and SWMS. Partner
products
Project Hazard/Risk Assessment / Page 54 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.