Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
Workers electrocuted / EXTREME 5 Switchboards must be constructed to comply with the following requirements: Site Management
shocked. Electrical Contractor
- Be connected to incoming supply by a direct method (e.g., wired to terminals)
Faulty installation - Be of robust construction
- Have a door or lid which:
• is fixed so they are kept closed (except for access) and require a tool to remove.
• is lockable,
• be attached so as not to damage cables / extension cords etc.; and
• has a means of keeping the door open when required for electrical work.
- Be positioned so that an appropriate flexible extension cord of suitable length can be used.
- Be securely attached to the floor, a pole, post, wall.
- Have at least one (1) 10amp power point and where required (1) 15amp point.
- Have a means of supporting electrical leads off the floor, i.e. lead stand, cross arm.
- Isolating switch i.e. “main switch”, “distribution board isolation switch.” “Isolating switch after-hours supply-do not
switch off”, must be marked as required by AS/NZS 3000 in letters 6mm high in contrasting colour to background
material.
- Additional switches clearly identified for final sub circuits intended to operate after hours, and emergency systems.
- Isolating switches provided with isolating device for securing in the open position.
- Lockable covers (made from non-conductive materials) provided over circuit breakers and RCD associated with
outgoing circuits, but which do not prevent access to isolating switches (unless the installation comprises of only one
final sub-circuit or includes or incorporates a combined mains circuit breaker / RCD as the main switch, in which case
the fitting of the lockable cover is not required).
- On the cover of the RCD’s and circuit breakers marked “In the event of an RCD or circuit-breaker operating, the cause
of any fault should be assessed by a competent person”.
- Fix a caution or danger safety sign to advise of electrical hazard.
- Have live parts protected to prevent contact by anyone connecting or disconnecting plugs.
- Have an insulated anchorage tie bar provided if there are power points on the board to prevent straining on the
cable going into the power supply.
- Have an insulated slot in the base for leads to go through and a sign fitted to it stating, “keep closed – run all leads
through bottom.”
Use of electrical Workers electrocuted / EXTREME 5 Portable RCDs will be tested by the user before each use daily and undergo an operating time at tripping current test Site Management
circuits shocked. using an RCD tester carried out by a licenced electrician every 3 months. Contract Partner
Faulty wiring
Electricity MEDIUM 4 Domestic power boards are not permitted on site. All power boards to comply with AS/NZS 3012 and be RCD protected. Site management
Contract Partner
Project Hazard/Risk Assessment / Page 58 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.