Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                                     Proposed Controls                                                                               Responsible
     Activity                  Hazards




                                                          Risk
                                                                                                                                                                                                                        Risk




                                                                         HOC




                                                         Initial
                                                         Rating
                                                                                                         (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                               Person




                                                                                                                                                                                                                      Residual
Planning works      Contact with overhead power      EXTREME             5     Safe approach distances will be determined by plant operators and/or the Site Supervisor using the relevant state                                  Site Management
around overhead     lines                                                      legislation, COP and Australian Standards prior to any work commencing near overhead power lines.                                                  Contract Partner
powerlines                                                                                                                                                                                                                        Site Management
                    Contact with overhead power      EXTREME             5     Consultation with the utility entity shall occur to inform of work activities when near assets and identify any specific
                    lines.                                                     controls that may be required.                                                                                                                     Contract Partner
                    Contact with covered /                                     All work occurring near network assets must adhere to any requirements of an electricity entity responsible for the line.
                    underground services

                    Contact with overhead power      EXTREME             5     No worker, equipment, loads being moved, crane or plant will be required to enter the exclusion zone around power                                  Site Management
                    lines                                                      lines.                                                                                                                                             Contract Partner

                    Contact with overhead power      EXTREME             5     An electrical safety observer will work with the operator of any plant and equipment, which could enter the exclusion                              Site Management
                    lines                                                      zone. The electrical safety observer will have no other duty and will only observe one crane or piece of plant at a time.                          Contract Partner

                    Workers electrocuted /           EXTREME             5     Work on site will be undertaken within the safe approach distances (i.e. exclusion zones) and special provisions will be                           Site Management
                    shocked                                                    made including:                                                                                                                                    Contract Partner
                                                                               - To notify and obtain written permission from the power authority before commencing work.
                                                                               - Not to commence work until a pre-start site meeting, a risk assessment detailing the necessary controls to be
                                                                                   implemented and training has been completed.

Plan for working    Striking underground services    EXTREME                   Assessment of underground services completed prior to the commencement of works including:                                                         Site Management
around                                                                         - DBYD
underground
power                                                                          - Service location (i.e., scanning etc.)
                                                                               - Potholing (positive identification of service location)
Planning for        Inadvertent contact with         EXTREME                   Assessment of live buildings to identify services remaining live during construction:                                                              Site Management
working around live electrical services                                                                                                                                                                                          Electrical contractor
                                                                               If live permanent wiring is located where construction activity is occurring it, or its location shall be marked with the
electrical circuit                                                             words ‘LIVE WIRING’ at intervals not exceeding 5m.
                                                                               Live permanent wiring shall be readily distinguishable from construction.

References          AS/NZ 3012 Electrical Installations – Construction
                    AS/NZS 3000 Wiring
                    AS 3010 – Electrical installations – Generating sets

Review /            Safety Interactions, Task Observations, SWMS Review Weekly HSE Inspection, Monthly Audit as per Procore Inspection Matrix
Monitoring


     9.3Electrical equipment
Planning            Electrocution                         HIGH           5     Contract Partner’s will supply an electrical register to demonstrate compliance with the above requirements                                        Site Management
                                                                                                                                                                                                                                  Contract Partner


                                                                                                                                                                    Project Hazard/Risk Assessment / Page 60 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.