Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Person
HC
Activity Hazard
Risk
Risk
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Site
HIGH 5 Employers who’s work activities involves the use of hazardous chemicals shall provide a SWMS for review and approval. The SWMS Management
shall include control measure in the event of a spill.
Contract Partner
Site
Use of Specific No means of EXTREME 3 Applicable spill kits for the work activities to be performed on site have been identified in the Emergency Preparedness and Management
Equipment confining or Response Plan, are readily available and fully stocked.
cleaning up the Contract Partner
chemical spill
Site
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract Partner
route, isolate procedures and
specific hazard, processes
prevent spread
of contaminants Site
Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
where possible unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
hazard details. Contract Partner
Site
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Management
familiar with assembly point and pedestrian routes.
location of
assembly
point/s or
pedestrian
traffic routes
19.6 Confined Space Rescue
Site
Planning for Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Management
confined space planning,
rescue hazard
identification,
resourcing, and Site
HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Management
implementation
of controls
Project Hazard/Risk Assessment / Page 135 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.