Original source · versioned page text
Delegated Report - Code - Planning MCU22 0087 [As Published]
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
DEVELOPMENT ASSESSMENT DELEGATED REPORT
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
*(Refer to Advisory Note)
Fencing, Walls and Screening
101. Fencing must:
a. Be located wholly within lot boundaries.
b. Have a design life commensurate with the new buildings.
c. Be finished in neutral colour tones that blend with the surrounding landscape.
d. Be setback 2 metres behind landscaping.
FOLLOWING CONSTRUCTION
Bonds
102. Bonds must:
a. Meet the requirements of the relevant Council Planning Scheme Policy for performance
and uncompleted works.
b. Be calculated using a schedule of works and relevant bond equation.
c. Include GST.
d. Have approval of the bond calculations and amount from Council, prior to lodgement.
e. Be lodged with Council and accompanied by the Bond Administration Fee/s.
f. Be requested for release by writing to Council, when relevant approval requirements
have been met.
103. Performance Bonds must be lodged for:
a. Streetscape and Amenity Landscape.
On Maintenance
104. Maintenance periods* must be:
a. 12 months for Streetscape and Amenity Landscape.
*(Refer to Advisory Note)
105. Prior to requesting an On Maintenance inspection, the following information package
(prepared by respective qualified persons* and certifying compliance with approvals) must
be submitted to Council:
a. All required bonds.
b. Landscaping certification.
c. AS2303 Trees for landscape use certification (addressing each specimen).
Off Maintenance
106. Prior to requesting an Off Maintenance inspection the following must be provided:
a. Written request of bond release.
107. Off Maintenance Inspection must be requested:
a. By contacting Council.*
b. Only after lodgement of a completed Landscape Checklist and all other required
certification and documentation.
c. Only after all works are confirmed in good order including:
Page 38 of 42
Document Set ID: 22374890
Version: 10, Version Date: 06/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.