DEVELOPMENT ASSESSMENT DELEGATED REPORT
Performance Bond
7. Where the works include Council assets (construction of new or modifications to existing) a
portion of the performance bond will be retained as a “maintenance bond” as described in
Council’s Planning Scheme Policy 6 Engineering Design Standards. Alternatively, the
developer may submit a separate “maintenance bond” at the completion of the works.
The bond amount will be:
a. 5% of the agreed value of the works or
b. $1500, whichever is the greater amount
Fires in Urban Areas
8. In urban areas fires are prohibited except where in an appliance is used for domestic heating
or cooking purposes, which must comply with particular standards. Any area identified as a
fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
Law No. 3, Schedule 3. Refer to the following link for details:
https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
Building and Construction Industry (Portable Long Service Leave) Levy
9. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Private Infrastructure
10. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority.
Prestart, On and Off Maintenance, Rehabilitation Inspections Request
11. Contact Council on 5329 6500 to arrange a prestart meeting or an inspection giving a
minimum of five business days’ notice of preferred inspection time.
Prestart
12. Tree Protection Bond:
a. may be drawn upon by Council if:
i. the recommendations of the Arborist report are not implemented and,
ii. any trees identified for retention are damaged to the point where they cannot be
saved.
b. will be returned upon receiving certification from the site Arborist that all requirements
nominated in the Arborist report referenced within this Decision Notice have been
completed.
13. All tree retention and protection works must be carried out in accordance with methodology
and recommendations detailed in the Arborist report listed within this Decision Notice. Prior
to requesting a prestart meeting, a bank guarantee in accordance with the values nominated
by this decision must be lodged with Council as security for the protection of the trees
identified for retention within the Arborist report referenced within this Decision Notice. The
guarantee:
a. may be drawn upon by Council if:
i. the recommendations of the Arborist report are not implemented and,
ii. any trees identified for retention are damaged to the point where they cannot be
saved (as confirmed by the site Arborist and agreed in writing by Council)
Page 40 of 42
Document Set ID: 22374890
Version: 10, Version Date: 06/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.