Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Submission regarding ARN 13200B.176.05

Attached to the e-mail PM Submission - Thomas - 132008.176.05.

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Proposed bike riding network plan

 

Bike riding network plan - key coastal centres

 

Tewantin

 

 

 

 

 

 

 

 

LEGEND
© Major Cente = mee Principal Transport Secondary Recreabonal
© District Centre Secondary Transport Local Routes 1
Principal Recreational Trails
© Local Centre
Trail Connector
@ —_Neighvourhood

 

Shortcomings for Pedestrians and Cyclists

; Noosa LGA

Railway Network

 

The proposed development is generally not connected to the Council’s walking & bike riding plan.
There is one beautiful walkway from the river connecting the proposed development and then
leading to “The J”. This is an excellent example of what can and needs to be done in the surrounding
area to build a network where people can walk to the beach, the market, the lookout, etc.

In the SEQ priority route maps (from 2019) the proposed development might be connected in 10-15

years (Priority B). This is too late or the proposed development is too early.

 

 
  
 
 
 
 
 
 
 
 
 
 
 

1.2 Update of Priority Route Maps

In 2017, the Priority Route Maps were published, to be updated
every two years. In 2019, the department collaborated with
local government to update the maps to reflect current delivery
priorities. Principal routes were identified as:

Priority A (focus of delivery in the next 10 years)
Priority B (for delivery in the next 10 to 15 years)
Priority C (for delivery in the next 15 to 20 years)
Priority D (for delivery in the next 20 years or more)
Existing (as reported by local road authority).

Routes identified as Priority A, B, C, or D may have existing

cycling infrastructure on them. The priority reflects that the road
authority may intend to undertake further planning, design and/
or construction on the route such as an upgrade of the existing
infrastructure or filling missing links.

 
Log in to download the original file

Submission regarding ARN 13200B.176.05.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.