PROJECT NOTES (NOTE THAT ALL NOTES MAY NOT APPLY)
GENERAL                                           GENERAL (CONTIINUED)                                                      CONTROLLED FILLING
                                                                                                                                                                           CREEK CROSSING NOTES                                                        SEWERAGE SUPPLY NOTES
                                                                                                                                                                           CREEK CROSSINGS NOTES




                                                                                                                                (A)   SAND FILLING UP TO 800 DEEP,PLACED
1.   THESE ENGINEERING DRAWINGS HAVE BEEN          27. ALL REDUNDANT CROSSOVERS, ETC SHALL BE                                                                                                      1.   SILTATION CONTROL MEASURES SHALL BE            1.   ALL WORK AND MATERIALS SHALL BE IN
                                                                                                                                      IN MAXIMUM 300mm THICK LAYERS
     PREPARED FROM INFORMATION AVAILABLE AT            REMOVED                                                                                                                                          PLACED DOWNSTREAM OF ANY EXCAVATION                 ACCORDANCE WITH CURRENT SOUTH EAST
                                                                                                                                      AND COMPACTED WITH A VIBRATING
     THE TIME. AS THIS INFORMATION MAY BE THE                                                                                                                                                           WORK.                                               QUEENSLAND SEWERAGE CODE SPECIFICATIONS
                                                                                                                                      ROLLER TO ACHIEVE A MINIMUM
     SUBJECT OF CHANGE PRIOR TO OR DURING          28. ALL FILL SHALL BE APPROVED BY THE                                                                                                                                                                    AND STANDARDS.
                                                                                                                                      DYNAMIC CONE PENETRO- METER
     CONSTRUCTION, THE CONTRACTOR IS                   SUPERVISING ENGINEER PRIOR TO USE                                                                                                           2.   APPROPRIATE SEDIMENT CONTROLS SHALL BE
                                                                                                                                      READING OF 7 BLOWS PER 300

                                                                                                                                                                                                                                                                                                                                                                   LINDSAY CONSULTING PTY
     REQUESTED TO ADVISE THE ENGINEER WHERE                                                                                                                                                             USED TO PREVENT SEDIMENT FROM ENTERING         2.   UNLESS SPECIFIED OTHERWISE ALL MATERIALS
                                                                                                                                                                                                                                                                                                                                                                     LINDSAY CONSULTING PTY LTD




                                                                                                                                      PENETRATION (REFER AS 1289.F3.3).
     DIFFERENCES OCCUR. THESE DRAWINGS SHALL
     NOT BE USED FOR FINAL SETOUT OF THE
                                                  SAFETY                                                                                                                                                THE CREEK.                                          AND WORK SHALL COMPLY WITH THE RELEVANT
                                                                                                                                                                                                                                                            AUSTRALIAN STANDARDS.
                                                                                                                                                                                                                                                                                                                                                                                      LTD
                                                                                                                                      SAND FILL MAY BE FLOODED IF
     PROJECT UNLESS SPECIFICALLY STATED.                                                                                                                                                           3.   NO SOIL SHALL BE STOCKPILED WITHIN 5m OF
                                                   1.   REFER TO THE PROJECT DOCUMENTS FOR AN                                         NECESSARY TO ACHIEVE THIS
                                                                                                                                                                                                        THE CREEK.                                     3.   THE CONSTRUCTION OF THE SEWERAGE WORK
                                                        ASSESSMENT OF THE RISKS ASSOCIATED WITH                                       COMPACTION STANDARD, PROVIDED
2.   INSPECTIONS ARE REQUIRED TO BE PERFORMED                                                                                                                                                                                                               SHOWN ON THIS DRAWING SHALL BE SUPERVISED                                                                                                               RPEQ 4928
                                                        THE ANY WORKS AND RECOMMENDED                                                 THE WATER CAN SUBSEQUENTLY BE
     BY A DULY APPOINTED COMPETENT PERSON(S).                                                                                                                                                                                                               BY AN ENGINEER WHO HAS RPEQ REGISTRATION
                                                                                                                                      DRAINED FROM THE SITE.               REHABILATION
                                                                                                                                                                           REHABILIATION NOTES




                                                        TREATMENTS.                                                                                                                                                                                                                                                                                                OFF. 2C/82 PARKER STREET, MAROOCHYDORE         PH 54 792 118
     REFER TO PRINCIPLE CONTRACTOR, CERTIFIER,                                                                                                                                                                                                              AND ENDORCEMENT FROM THE RELEVENT
     STATE GOVERNMENT LEGISLATION OR COUNCIL
     FOR FOR HOLD POINTS.
                                                   2.   WHERE THERE IS IS NO OVER RIDING PROJECT                                (B)   NON-SAND FILLING UP TO 400 DEEP,
                                                                                                                                                                                                   1.   PREDISTURBANCE SOIL PROFILES AND
                                                                                                                                                                                                                                                            AUTHOIRITY . SEWERAGEWORKS NOT COMPLYING
                                                                                                                                                                                                                                                            WITH THIS REQUIREMENT WILL NOT BE
                                                                                                                                                                                                                                                                                                                                                                  THIS DRAWING REMAINS THE PROPERTY OF
                                                        DOCUMENT/ SPECIFICATIONS THEN REFER TO
                                                        THE PRINCIPLE CONTRACTOR FOR ALL SAFETY
                                                                                                                                      PLACED IN MAXIMUM 150 mm THICK
                                                                                                                                      LAYERS AND COMPACTED WITH A
                                                                                                                                                                                                        COMPACTION LEVELS SHALL BE REINSTATED.              PERMITTED TO CONNECT INTO THE SEQ SERVICE                                                             LINDSAY CONSULTING PTY LTD AND IS FOR
3.   THESE DRAWINGS SHALL BE READ IN
     CONJUNCTION WITH ALL ARCHITECTURAL AND
                                                        REQUIREMENTS                                                                  MECHANICAL ROLLER. CLAY FILL
                                                                                                                                                                                                   2.   PREDISTURBANCE VEGETATION PATTERNS SHALL
                                                                                                                                                                                                                                                            PROVIDER SEWERAGE SYSTEM.
                                                                                                                                                                                                                                                                                                                                                                    THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                      SHALL BE MOIST DURING
     OTHER CONSULTANTS DRAWINGS AND
                                                   3.   CONSULTATION WITH AFFECTED PARTIES IS                                         COMPACTION.
                                                                                                                                                                                                        BE RESTORED.                                   4.   ALL WORK ASSOCIATED WITH LIVE SEWERS OR                                                               MAY BE USED IN PART OR WHOLE WITHOUT
     SPECIFICATIONS AND WITH SUCH OTHER                                                                                                                                                                                                                     MAINTENANCE HOLES SHALL BE CARRIED OUT BY
     WRITTEN INSTRUCTIONS AS MAY BE ISSUED
                                                        MANDATORY WHEN IDENTIFYING
                                                                                                                                                                           STORMWATER DRAINAGE NOTES                                                        THE SEQ SERVICE PROVIDER AT THE                                                                          PRIOR EXPRESS WRITTEN CONSENT OF
                                                        HAZARDS,ASSESSING RISKS AND DECIDING ON                                 (C)   CONTROLLED FILLING SHALL
     DURING THE COURSE OF THE CONTRACT.
                                                        CONTROL MEASURES.                                                             CONTINUE FOR AT LEAST 1 METRE
                                                                                                                                                                                                                                                            DEVELOPER'S COST.                                                                                           LINDSAY CONSULTING PTY LTD
                                                                                                                                      PAST THE EDGE OF THE FOOTING                                 1.   ANY CHANGES SHALL BE APPROVED BY THE
4.   ALL DISCREPANCIES SHALL BE REFERRED TO THE                                                                                                                                                                                                        5.   ALL PIPES AND MATERIALS SHALL COMPLY WITH
     ARCHITECT/ENGINEER FOR DECISION BEFORE
     PROCEEDING WITH THE WORK.
                                                   4.   CONSTRUCTION SHALL BE CARRIED OUT USING
                                                        SAFE WORK METHODS AND IN ACCORDANCE
                                                                                                                                      BEAM AND SHALL BE BATTERED BACK
                                                                                                                                      TO THE ORIGINAL SURFACE WITH A
                                                                                                                                                                                                        ENGINEER IN WRITING PRIOR TO CARRYING OUT
                                                                                                                                                                                                        OF THE WORKS
                                                                                                                                                                                                                                                            THE REQUIREMENTS OF THE "ACCEPTED
                                                                                                                                                                                                                                                            PRODUCTS ANDMATERIALS" LIST.
                                                                                                                                                                                                                                                                                                                                                                  CLIENT AND PROJECT DESCRIPTION
                                                        WITH THE FOLLOWING DOCUMENTS:-                                                SLOPE OF NO MORE THAN
5.   ALL DIMENSIONS RELEVANT TO SETTING OUT AND
     OFF-SITE WORK SHALL BE VERIFIED BY THE       LEGISLATION
                                                                                                                                      1:2 (VERT : HOR).                                            2.   ALL LEVELS TO AHD.
                                                                                                                                                                                                                                                       6.   EACH ALLOTMENT SHALL BE SERVED BY A DN110
                                                                                                                                                                                                                                                            PE (OR DN100 PVC) PROPERTY CONNECTION. FOR
                                                                                                                                                                                                                                                                                                                                                                    EAGLE SURVEYS
                                                                                                                                (D)   WHERE THE DEPTH OF FILLING                                   3.   ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
     CONTRACTOR BEFORE CONSTRUCTION AND                                                                                                                                                                                                                     ALLOTMENTS OTHER THAN SINGLE RESIDENTIAL,
                                                   -    WORKPLACE HEALTH AND SAFETY ACT 2011                                          MATERIAL EXCEEDS THAT SPECIFIED                                   NOTED OTHERWISE.
     FABRICATION IS COMMENCED.                                                                                                                                                                                                                              A DN160 PE (OR DN150 PVC) PROPERTY
                                                                                                                                      ABOVE, THE FILLING MATERIAL SHALL
6.   THE ENGINEER'S DRAWINGS SHALL NOT BE
                                                   -    WORKPLACE HEALTH AND SAFETY REGULATION
                                                        2011                                                                          BE COMPACTED AS FOLLOWS:-                                    4.   ALL DIMENSIONS AND LEVELS ARE TO BE
                                                                                                                                                                                                        CHECKED ON-SITE BEFORE WORK COMMENCES.
                                                                                                                                                                                                                                                            CONNECTION SHALL BE PROVIDED.
                                                                                                                                                                                                                                                                                                                                                                    PROPOSED SUBDIVISION
     SCALED.
                                                  QUEENSLAND GOVERNMENT CODES OF
                                                                                                                    (i)        SAND FILL TO 65% DENSITY
                                                                                                                                           INDEX IN ACCORDANCE WITH                                5.   DIMENSIONS SHALL NOT BE OBTAINED BY
                                                                                                                                                                                                                                                       7.   PROPERTY CONNECTIONS SHALL BE LOCATED
                                                                                                                                                                                                                                                            WITHIN THE PROPERTY AS SHOWN IN THE                                                                     33 CRANK STREET,
7.   DURING CONSTRUCTION THE CONTRACTOR           PRACTICE                                                                                                                                                                                                  DRAWINGS.
     SHALL BE RESPONSIBLE FOR MAINTAINING THE
     STRUCTURE IN A STABLE CONDITION AND
                                                                                                                                           AS1289.E6.1                                                  SCALING THE DRAWING.
                                                                                                                                                                                                                                                       8.   PROPERTY CONNECTION BRANCHES SHALL
                                                                                                                                                                                                                                                                                                                                                                    TEWANTIN
                                                   -    CONFINED SPACES: CODE OF PRACTICE 2016                      (ii)       NON-SAND FILL TO 95%                                                6.   FOR BUILDING SET-OUT REFER ARCHITECTURAL
     ENSURING NO PART SHALL BE OVERSTRESSED        -    FORMWORK CODE OF PRACTICE 2016                                                                                                                                                                      EXTEND INTO THE PROPERTY A MINIMUM OF 300
                                                                                                                                          MAXIMUM DRY DENSITY                                           DRAWINGS
     UNDER CONSTRUCTION ACTIVITIES.                -    HAZARDOUS MANUAL TASKS: CODE OF PRACTICE                                                                                                                                                            mm AND A MAXIMUM OF 750 mm. UNITYWATER
                                                                                                                                          (STANDARD COMPACTION) IN
                                                        2016                                                                                                                                                                                                REQUIRES MINIMUM EXTENSION OF 500 mm INTO
                                                                                                                                          ACCORDANCE WITH AUSTRALIAN                               7.   THE LOCATION AND DEPTH OF ALL SERVICES
8.   WORKMANSHIP AND MATERIALS ARE TO BE IN        -    HOW TO MANAGE WORK HEALTH AND SAFETY                                                                                                                                                                PROPERTY.
                                                                                                                                          STANDARD                                                      SHALL BE VERIFIED ON SITE WITH THE
     ACCORDANCE WITH THE RELEVANT CURRENT
     S.A.A. CODES INCLUDING ALL AMENDMENTS, AND    -
                                                        RISKS: CODE OF PRACTICE 2011
                                                        MANAGING NOISE AND PREVENTING HEARING
                                                                                                                    EARTHWORKS CONTINUED                                                                REVLEVANT AUTHORITY PRIOR TO THE
                                                                                                                                                                                                        COMMENCEMENT OF WORKS
                                                                                                                                                                                                                                                       9.   WHERE PIPES ARE LAID IN FILL, THE FILLING                                                             DRAWING TITLE
     THE LOCAL STATUTORY AUTHORITIES, EXCEPT                                                                                                                                                                                                                SHALL BE CARRIED OUT IN LAYERS NOT
                                                        LOSS AT WORK: CODE OF PRACTICE 2015

                                                                                                                                                                                                                                                                                                                                                                   NOTES
     WHERE VARIED BY THE CONTRACT DOCUMENTS.                                                                        (iii)      COMPACTION TESTS SHALL BE                                                                                                    EXCEEDING 300 mm (LOOSE) IN DEPTH AND SHALL
                                                   -    MANAGING THE RISK OF FALLS AT WORKPLACES:                                                                                                  8.   DURING CONSTRUCTION BARRIERS, LIGHTS &
                                                                                                                                         CARRIED OUT ON EACH LAYER                                                                                          BE COMPACTED UNTIL THE COMPACTION IS NOT
                                                        CODE OF PRACTICE 2011                                                                                                                           SIGNS SHALL BE MAINTAINED TO ENSURE SAFE
9.   THE APPROVAL OF A SUBSTITUTION SHALL BE                                                                                             AS THE FILLING IS PLACED. IF                                                                                       LESS THAN 95% OF THE MATERIALS MAXIMUM
                                                   -    MANAGING WORK ENVIRONMENT AND FACILITIES:                                                                                                       PASSAGE OF TRAFFIC AND PEDESTRIANS IN
     SOUGHT FROM THE ENGINEER, BUT IS NOT AN                                                                                             THE COMPACTION STANDARD                                                                                            COMPACTION WHEN TESTED IN ACCORDANCE
                                                        CODE OF PRACTICE 2011                                                                                                                           ACCORDANCE WITH THE REQUIREMENTS OF THE
     AUTHORIZATION FOR AN EXTRA. ANY EXTRA                                                                                               SPECIFIED IS NOT ACHIEVED,                                                                                         WITH A.S. 1289 (MODIFIED COMPACTION). TESTING
                                                   -    MOBILE CRANE: CODE OF PRACTICE 2006                                                                                                             LOCAL AUTHORITY.
     INVOLVED MUST BE TAKEN UP WITH THE                                                                                                  THEN A "PIER AND SLAB" AND                                                                                         SHALL BE CARRIED OUT AFTER EACH ALTERNATE
                                                   -    SCAFFOLDING: CODE OF PRACTICE 2009
     ARCHITECT/ENGINEER AND/OR PRINCIPLE                                                                                                 "PIER AND BEAM" FOOTING                                                                                            LAYER. IN ALL SUCH CASES APPROVAL OF
                                                   -    STEEL CONSTRUCTION: CODE OF PRACTICE 2004                                                                                                  9.   ALL WORK AND MATERIALS SHALL BE IN
     BEFORE THE WORK COMMENCES.                                                                                                          DESIGN SHALL BE ADOPTED                                                                                            CONSTRUCTED SEWERS WILL NOT BE ISSUED BY
                                                   -    TILT-UP AND PRE-CAST CONSTRUCTION                                                                                                               ACCORDANCE WITH CURRENT LOCAL
                                                                                                                                         WITH ALL PIERS FOUNDED                                                                                             THE SEQ SERVICE PROVIDER UNLESS
                                                        INDUSTRY CODE OF PRACTICE 2003                                                                                                                  AUTHORITIES SPECIFICATIONS AND STANDARDS.
10. UNLESS NOTED OTHERWISE ALL DIMENSIONS                                                                                                ON THE NATURAL UNDERLYING                                                                                          CERTIFICATES ARE PRODUCED CERTIFYING THAT
    ARE IN MILLIMETRES
                                                   -
                                                   -
                                                        TOWER CRANE: CODE OF PRACTICE 2006
                                                        WORK HEALTH AND SAFETY CONSULTATION,
                                                                                                                                         MATERIAL.
                                                                                                                                                                                                   10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
                                                                                                                                                                                                                                                            THE REQUIRED COMPACTION HAS BEEN                                                                      SCALES
                                                                                                                                                                                                                                                            ACHIEVED.
                                                        CO-OPERATION AND CO-ORDINATION CODE OF                                                                                                         NOTIFYING ALL RELEVANT AUTHORITIES AND
11. ALL LEVELS ARE EXPRESSED IN METRES.                                                                                         ROLLED FILLING
                                                        PRACTICE 2011                                                                                                                                  PAYING ALL FEES NECESSARY BEFORE
                                                                                                                                                                                                                                                       10. WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR
                                                   -    SAFE DESIGN OF STRUCTURES CODE OF                                                                                                              COMMENCING WORK, FOR LOCATING ALL
12. ALL PROPS AND FORMWORK FOR BEAMS AND                                                                                        (A)   SAND FILLING UP TO 600 DEEP,                                                                                         STEEPER,BULKHEADS SHALL BE CONSTRUCTED
                                                        PRACTICE 2014 OTHER REFERENCES:                                                                                                                EXISTING SERVICES AND FOR REPAIR OF ANY
    SLABS SHALL BE REMOVED BEFORE                                                                                                     PLACED IN MAXIMUM 300mm THICK                                                                                        IN ACCORDANCE WITH THE SEQ SEWER CODE.
                                                   -    NATIONAL CODE OF PRACTICE FOR PRECAST,                                                                                                         SERVICES DAMAGED AS A RESULT OF THE
    CONSTRUCTION OF ANY MASONRY WALLS OR                                                                                              LAYERS AND COMPACTED BY
                                                        TILT UP AND CONCRETE ELEMENTS IN BUILDING                                                                                                      FOOTPATHS AND PRIVATE PROPERTY SHALL BE
    PARTITIONS ON THE FLOOR.                                                                                                          REPEATED ROLLING WITH AN                                                                                         11. THE CONTRACTOR SHALL VERIFY THE LOCATION
                                                        CONSTRUCTION, 2008                                                                                                                             REINSTATED TO THEIR ORIGINAL CONDITION.
                                                                                                                                      EXCAVATOR.                                                                                                           AND DEPTH OF EXISTING SERVICES WITH
13. ALL NON LOAD BEARING WALLS SHALL BE KEPT                                                                                                                                                                                                               RELEVANT AUTHORITIES BEFORE COMMENCING
    CLEAR OF THE UNDERSIDE OF SLABS AND           CONTRACTORS SUBMISSIONS                                                       (B)   NON-SAND FILING UP TO 300 DEEP,
                                                                                                                                                                                                   11. ANY OBSOLETE/REDUNANT CIRCUITWAY
                                                                                                                                                                                                       CROSSINGS AND DRAINAGE OUTLETS FROM THE
                                                                                                                                                                                                                                                           WORKS.
    BEAMS BY 20mm                                                                                                                     PLACED IN MAXIMUM 150mm THICK
                                                                                                                                                                                                       KERB AND CHANNEL INCLUDING ASSOCIATED
                                                   1.   THE REINFORCEMENT, PRE-STRESSING AND                                          LAYERS AND COMPACTED BY                                                                                          12. SEWERS SHALL BE DISUSED /ABANDONED IN
                                                                                                                                                                                                       PIPES ACROSS THE FOOTPATH SHALL BE
14. UNLESS OTHERWISE SHOWN. SUBTERRANEAN                STRUCTURAL STEEL MATERIAL SUPPLIER MUST                                       REPEATED ROLLING WITH AN                                                                                             ACCORDANCE WITH PROCEDURES SET OUT IN
                                                                                                                                                                                                       REMOVED AND THE KERB AND CHANNEL AND
    TERMITE PROTECTION SHALL BE IN ACCORDANCE           BE CERTIFIED BY ACRS (AUSTRALIAN STANDARDS                                    EXCAVATOR                                                                                                            THE SEQ SEWER CODE.
                                                                                                                                                                                                       FOOTPATH REINSTATED TO THE LOCAL
    WITH AS 3660 - PART 1 AND THE BCA.                  CERTIFICATION AND VERIFICATION OF                                                                                                                                                                                                                                                     Protect   your
                                                                                                                                                                                                       AUTHORITIES CURRENT SPECIFICATIONS AND OR
                                                        REINFORCING, PRE-STRESSING AND STRUCTURAL                               (C)   WHERE THE DEPTH OF FILLING                                                                                       13. BENCH MARK AND LEVELS TO AHD.
                                                                                                                                                                                                       STANDARDS                                                                                                                              PERSONAL
15. NON-STRUCTURAL ITEMS SUCH AS DAMP PROOF             STEELS) FOR THE SUPPLY OF REINFORCEMENT,                                      MATERIAL EXCEEDS THAT SPECIFIED
    COURSING, FLASHING AND WEEP HOLES ARE               PRE-STRESSING STRUCTURAL STEEL.                                               ABOVE, THE FILLING MATERIAL SHALL                                                                                14. EXISTING ALLOTMENTS REQUIRING A PROPERTY
                                                                                                                                                                                                   12. THE CONTRACTOR'S ATTENTION IS DRAWN TO                                                                                                 INTERESTS.
    NOT SHOWN FOR CLARITY. REFER TO THE                                                                                               BE COMPACTED AS FOLLOWS:-                                                                                            CONNECTION FROM EXISTING SEWERS SHALL BE
    ARCHITECTURAL DETAILS AS REQUIRED              2.   SUBMIT CURRENT CERTIFICATES.
                                                                                                                                                                                                       THE REQUIREMENTS OF THE WORKPLACE HEALTH
                                                                                                                                                                                                       AND SAFETY ACT 1995. ALL WORK IS TO BE
                                                                                                                                                                                                                                                           PROVIDED BY THE SEQ SERVICE PROVIDER AT                                              HEAD              SURVEY DATUM
                                                                                                                    (i)        SAND FILL TO 65% DENSITY                                                                                                    THE DEVELOPERS COST.                                                               EYES
                                                                                                                                                                                                       CARRIED OUT IN ACCORDANCE WITH THIS ACT
16. ALL STORMWATER CULVERTS TO BE RCP CLASS
                                                  EARTHWORKS                                                                               INDEX IN ACCORDANCE WITH
                                                                                                                                                                                                       AND IN PARTICULAR THE CONTRACTOR TO                                                                                                    EARS
    2. ALL ROOFWATER PIPES TO BE uPVC, CLASS SH                                                                                            AS1289.E6.1
                                                                                                                                                                                                       ENSURE THE REQUIREMENTS OF THIS                 WATER SUPPLY NOTES                                                                                BODY      .
                                                   1.   EARTHWORKS TO COMPLY WITH AS3798.                                                                                                              SPECIFICATION WITH REGARD TO 'NOTIFICATION
17. SILT MANAGEMENT PLAN TO REMAIN IN PLACE                                                                         (ii)       NON-SAND FILL TO 95%                                                                                                                                                                                   HANDS
                                                                                                                                                                                                       IN RELATION TO A NOTIFIABLE PROJECT ARE         1.   ALL WORK AND MATERIALS SHALL BE IN
    UNTIL COMPLETION OF WORKS                                                                                                             MAXIMUM DRY DENSITY
                                                   2.   STRIP SITE OF ALL TOPSOIL, VEGETATION AND                                                                                                      FULFILLED.                                           ACCORDANCE WITH CURRENT SOUTH EAST
                                                                                                                                          (STANDARD COMPACTION) IN
                                                        DELETERIOUS MATTER TO A MINIMUM DEPTH OF                                                                                                                                                            QUEENSLAND WATER SUPPLY CODE
18. ALL PROPOSED OPERATIONAL WORKS SHALL BE
    CONSTRUCTED IN ACCORDANCE WITH COUNCIL'S
                                                        150 mm.
                                                                                                                                          ACCORDANCE WITH AUSTRALIAN
                                                                                                                                          STANDARD
                                                                                                                                                                                                   13. BENCHING OF PIT STRUCTURES SHALL HAVE A
                                                                                                                                                                                                       SMOOTH FINISHED SURFACE, AND PIPES SHALL
                                                                                                                                                                                                                                                            SPECIFICATIONS AND STANDARDS.
                                                                                                                                                                                                                                                                                                                                          FEET
                                                                                                                                                                                                                                                                                                                                                                  ASSOCIATED CONSULTANTS
    OPERATIONAL WORKS APPROVAL LETTER AND
                                                   3.   PROOF ROLL SUBGRADE TO REVEAL SOFT SPOTS.                                                                                                      NOT PROJECT INSIDE THE SHAFT OF THE PIT.        2.   UNLESS SPECIFIED OTHERWISE ALL MATERIALS
    COUNCIL'S DECISION                                                                                              (iii)      COMPACTION TESTS SHALL BE
                                                        SOFT SPOTS TO BE REMOVED AND BACKFILLED.                                                                                                                                                            AND WORK SHALL COMPLY WITH THE RELEVANT
                                                                                                                                         CARRIED OUT ON EACH LAYER
                                                        ALL NATURAL SUBGRADE IS TO BE COMPACTED                                                                                                    14. STORMWATER DRAINAGE PIPES SHALL BE UPVC              AUSTRALIAN STANDARDS.
19. CONCRETE KERB RAMPS SHALL BE ALIGNED TO                                                                                              AS THE FILLING IS PLACED. IF
    COMPLY WITH COUNCIL'S STANDARD DRAWING
                                                        TO ACHIEVE A DENSITY INDEX OF 70%.
                                                                                                                                         THE COMPACTION STANDARD
                                                                                                                                                                                                       PIPE (MINIMUM SEWER CLASS SN8) TO AS 14. 1260                                                        WARNING
                                                                                                                                                                                                       OR APPROVED EQUIVALENT. MINIMUM COVER TO        3.   ADOPT LIP OF KERB OR SHOULDER OF ROAD AS
    AND SHALL BE CONSTRUCTED STRICTLY IN
                                                   4.   MATERIAL WON FROM SITE TO BE INSPECTED BY
                                                                                                                                         SPECIFIED IS NOT ACHIEVED,
                                                                                                                                                                                                       ROOFWATER PIPES SHALL BE 50mm EXCEPT                 PERMANENT LEVEL.
                                                                                                                                                                                                                                                                                                            THE CONTRACTOR SHALL CONFIRM THE
    ACCORDANCE WITH COUNCIL STANDARD                                                                                                     THEN A "PIER AND SLAB" AND
                                                        ENGINEER FOR APPROVAL PRIOR TO USE AS
                                                                                                                                         "PIER AND BEAM" FOOTING
                                                                                                                                                                                                       WHERE REDUCED COVER IS REQUIRED TO                                                                   LOCATION OF ALL EXISTING SERVICES ON AND
                                                        FILLING UNDER SLABS. ANY IMPORTED FILL TO                                                                                                      DISCHARGE TO THE KERB AND CHANNEL.              4.   COVER ON MAINS FROM PERMANENT LEVEL TO
20. ALL TEMPORARY AND PERMANENT ROAD SIGNS
                                                        HAVE A MINIMUM CBR VALUE OF 15%. ALL FILL TO
                                                                                                                                         DESIGN SHALL BE ADOPTED
                                                                                                                                                                                                                                                            BE AS SHOWN IN SEQ-WAT-1200-2.
                                                                                                                                                                                                                                                                                                            EXTERIOR TO THE SITE INCLUDING WATER
    AND LINEMARKING SHALL COMPLY WITH THE                                                                                                WITH ALL PIERS FOUNDED
    CURRENT MANUAL OF UNIFORM TRAFFIC
                                                        BE COMPACTED TO EITHER CONTROLLED OR
                                                                                                                                         ON THE NATURAL UNDERLYING
                                                                                                                                                                                                   15. MINIMUM PIPE GRADES FOR STORMWATER AS                                                                MAINS, SEWER MAINS, GAS MAINS,
                                                        ROLLED FILL STANDARD AS SPECIFIED                                                                                                              3500 PART 3: PIPES SHALL COMPLY WITH - 1.0%     5.   CONDUITS TO BE INSTALLED IN ACCORDANCE
    CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE
                                                        ELSEWHERE
                                                                                                                                         MATERIAL.
                                                                                                                                                                                                       (MIN) GRADE FOR PIPES < 150 DIA. - 0.5% (MIN)        WITH THE STANDARD DRAWINGS.                     TELECOMMUNICATION CABLES, ELECTRICAL
    MARKING SHALL BE REMOVED BY GRINDING
                                                                                                                                                                                                       GRADE FOR PIPES > 150 BUT < 375 DIA.                                                                 CONDUITS, AND STORMWATER PIPES. ANY
    NOT"BLACKING OUT". COUNCIL DOES NOT
                                                   5.   WHERE SERVICE TRENCHES ARE REQUIRED TO         VEGETATION PROTECTION                                                                                                                           6.   A WATER METER SUPPLIED AT THE DEVELOPER'S
    APPROVE OF BLACKING OUT OF EXISTING LINE                                                                                                                                                                                                                                                                DAMAGE TO EXISTING SERVICES SHALL BE
    MARKING. KERB MARKERS SHALL BE PROVIDED
                                                        BE EXCAVATED BELOW FOOTING BASE LEVEL,
                                                                                                       NOTES                                                                                       16. CONCRETE CIRCUITWAY AND PARKING AREAS                COST, IS TO BE INSTALLED AT THE SERVICE POINT
    FOR ALL WATER, TELSTRA AND ANY OTHER
                                                        SIDE OF TRENCH SHALL BE LOCATED AWAY FROM                                                                                                      SHALL BE CONSTRUCTED WITH 32 MPa                     OF EACH LOT IN ACCORDANCE WITH THE              REPAIRED AT THE CONTRACTORS EXPENSE
                                                        SIDE OF FOOTING BY THE SAME DISTANCE THAT                                                                                                                                                           STANDARD DRAWING FOR THE SEQ-SP.
    SERVICE CONDUIT ROAD CROSSINGS AS
                                                        THE TRENCH IS BELOW FOOTING BASE. WHERE
                                                                                                                   1.       TREES LOCATED ALONG THE FOOTPATH SHALL                                 17. REFER HYDRAULIC DRAWINGS FOR SANITARY                                                                THE ENGINEER MUST BE NOTIFIED OF
    APPLICABLE.                                                                                                             BE, TRANSPLANTED PRIOR TO CONSTRUCTION,
                                                        THIS CANNOT BE ACHIEVED, THE STRUCTURAL
                                                                                                                            OR REPLACED IF DESTROYED.
                                                                                                                                                                                                       DRAINAGE LAYOUTS.                               7.   ALL MATERIALS USED IN THE WORKS SHALL           CHANGES PLANS. IF NOT, AS CONSTRUCTED
                                                        ENGINEER SHALL BE CONTACTED FOR FURTHER                                                                                                                                                             COMPLY WITH THE SEQ-SP's ACCEPTED
21. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF
                                                        DIRECTION.                                                                                                                                 18. COMPACTION OF MATERIAL UNDER CONCRETE                PRODUCTS AND MATERIALS LIST OR BE               DRAWINGS WILL NOT BE ISSUED
    SERVICES, ALL DIMENSIONS AND LEVELS PRIOR                                                                      2.       WHEN WORKING WITHIN 4m OF TREES, RUBBER                                    CIRCUITWWAYS AND PARKING AREAS SHALL BE (i)          APPROPRIATELY SHOWN, LISTED AND DEFINED IN
    TO CONSTRUCTION.                                                                                                        OR HARDWOOD GIRDLES SHALL BE
                                                   6.   ALL SOIL CONDITIONS SHALL BE AS PER                                                                                                            75% MINIMUM DENSITY FOR COHESIONLESS                 THE ENGINEERING SUBMISSION SO THAT THE
                                                                                                                            CONSTRUCTED WITH 1.8m BATTENS CLOSELY                                      MATERIAL (AS 1289 E5.1) AND (ii) 90% RELATIVE
22. ALL MATERIALS & WORKMANSHIP SHALL BE IN
                                                        SPECIFIED GEOTECHNICAL REPORT. WHERE
                                                        CONDITIONS VARY FROM REPORT THE
                                                                                                                            SPACED AND ARRANGED VERTICALLY FROM                                        DRY DENSITY (STD COMP.) FOR MATERIAL OTHER
                                                                                                                                                                                                                                                            ALTERNATIVE PRODUCT OR MATERIAL CAN BE
                                                                                                                                                                                                                                                            ASSESSED AND IF APPROPRIATE, APPROVED BY
                                                                                                                                                                                                                                                                                                            NOTE
    ACCORDANCE WITH AS2890, THE BUILDING CODE
    OF AUSTRALIA (INCLUDING THE QUEENSLAND
                                                        GEOTECHNICAL ENGINEER SHALL BE CONTACTED
                                                                                                                            GROUND LEVEL. GIRDLES SHALL BE STRAPPED
                                                                                                                            TO TREES PRIOR TO CONSTRUCTION AND REMAIN
                                                                                                                                                                                                       THAN (i)                                             THE SEQ-SP.                                     THE ENGINEER MUST BE NOTIFIED OF
                                                        FOR DIRECTIONS
    SUPPLEMENT), THE QUEENSLAND BUILDING ACT                                                                                UNTIL COMPLETION.                                                                                                          8.   ALL CONCRETE FOOTPATHS TO BE CLEAR OF
                                                                                                                                                                                                                                                                                                            CHANGES PLANS. IF NOT, AS CONSTRUCTED
    AMENDMENT ACT 1991 AND THE LOCAL
    AUTHORITY'S BY-LAWS.
                                                   7.   THE CONTRACTOR(S) SHALL FULLY INFORM
                                                                                                                   3.       TREE ROOTS SHALL BE TUNNELLED UNDER,
                                                                                                                                                                                                                                                            WATER MAINS.                                    DRAWINGS WILL NOT BE ISSUED
                                                        THEMSELVES OF THE GROUND CONDITIONS ON
                                                                                                                            RATHER THAN SEVERED. IF ROOTS ARE SEVERED                                                                                  9.   TEST/CHLORINATION POINTS TO BE INSTALLED IN
                                                        SITE PRIOR TO COMMENCEMENT OF THE WORKS
23. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN                                                                                 THE DAMAGED AREA SHALL BE TREATED WITH A
    RELEVANT APPROVALS PRIOR TO
                                                        AND ADOPT SEEPAGE AND DRAINAGE CONTROL                                                                                                                                                              ACCORDANCE WITH STANDARD DRAWING                                                                     REVISION LIST
                                                                                                                            SUITABLE FUNGICIDE. CONTACT RELEVANT
    COMMENCEMENT OF WORKS.
                                                        AND CONSTRUCTION PRACTICES APPROPRIATE
                                                                                                                            COUNCIL ARBORIST FOR FURTHER ADVICE.
                                                                                                                                                                                                                                                            NO.SEQ-WAT-1410-1.                                                                                   A ORIGINAL ISSUE                                      21/5/25
                                                        FOR THE SITE CONDITIONS.                                                                                                                                                                                                                            IT IS THE RESPONSIBILITY OF THE FOREMAN TO           A ORIGINAL ISSUE                                      21/5/25
                                                                                                                                                                                                                                                       10. THE CONSTRUCTION OF THE WATER
24. KERB MARKERS SHALL BE PROVIDED FOR ALL
                                                  8.    WHERE ANY FILLING IS CARRIED OUT ON THE SITE
                                                                                                                   4.       ANY TREE LOPPING REQUIRED SHOULD BE                                                                                            RETICULATION WORK SHOWN ON THIS DRAWING          CONTACT THE RELEVANT SERVICE AUTHORITIES TO
    WATER, TELSTRA AND ANY OTHER SERVICE                                                                                    UNDERTAKEN BY AN APPROVED ARBORIST.
    CONDUIT ROAD CROSSINGS AS APPLICABLE
                                                        AFTER THE COMPLETION OF THE SITE                                                                                                                                                                   MUST BE SUPERVISED BY AN ENGINEER WHO HAS        ASCERTAIN THE EXACT LOCATION OF SERVICES
                                                        INVESTIGATION, THE FOLLOWING REQUIREMENTS                                                                                                                                                          RPEQ REGISTRATION. WORKS NOT COMPLYING
25. ALL VARIATIONS SHALL BE BE APPROVED IN
                                                        SHALL BE FOLLOWED:                             SOIL NOTES                                                                                                                                          WITH THIS REQUIREMENT WILL NOT BE                PRIOR TO CONSTRUCTION
                                                                                                                   1.       TOPSOIL AND SUBSOIL SHALL BE STOCKPILED                                                                                        PERMITTED TO CONNECT TO THE RETICULATION
                                                                                                       SOIL NOTE




    WRITING BY THE ENGINEER BEFORE BEING
                                                   •    THE SITE SHALL BE STRIPPED OF ALL                                   SEPARATELY.                                                                                                                    SYSTEM.
    CARRIED OUT
                                                        VEGETATION PRIOR TO THE PLACEMENT OF ANY
                                                        FILLING MATERIAL.                                          2.       CARE SHALL BE TAKEN TO PREVENT SEDIMENT
26. THE CONTRACTOR SHALL CONFIRM THE
    LOCATION OF ALL EXISTING SERVICES ON AND                                                                                FROM ENTERING THE STORMWATER SYSTEM.
                                                   •    COMPACTION STANDARDS FOR FILLING MATERIAL                           THIS MAY INVOLVE PLACING APPROPRIATE
    EXTERIOR TO THE SITE INCLUDING BUT NOT
    LIMITED TO WATER MAINS, SEWER MAINS, GAS                                                                                SEDIMENT CONTROLS AROUND STOCKPILES.
    MAINS, LELECTRICAL CABLES,
    TELECOMMUNICATION CABLES. ANY DAMAGE TO                                                                        3.       IF ACID SULPHATE SOILS EXIST IN THE WORKS
    EXISTING SERVICES ITS THE RESPONSIBILITY OF                                                                             AREA. THE OUTPUTS FROM THE RISK
    THE CONTRACTOR AND AT THE CONTRACTORS                                                                                   ASSESSMENT BASED ON THE QUEENSLAND ACID
    EXPENSE                                                                                                                 SULPHATE SOIL TECHNICAL MANUAL SHALL BE                                                                                                                                                                                             Computer File
                                                                                                                            CONFORMED TO.                                                                                                                                                                                                                                                         250314OPW.DWG
                                                                                                                                                                                                                                                                                                                                                                DRAWING NUMBER                                      SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                   25-0314-IF2        2 B
Log in to download the original file

Negotiated - Compiled Reference Document - RAL25 0011 (As Published).pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.