2.5 Flooding
The proposed development site is not impacted by flooding.
3.0 - STORMWATER QUANTITY MANAGEMENT
The stormwater quantity analysis of the existing and developed site conditions has been carried out for
the project, refer appendix C with QUDM requiring the fraction impervious for the site to be low, 0.4, for
the existing site with the fraction impervious increasing to 0.9 for the proposed subdivision.
Lindsay Consulting Pty Ltd have calculated that the 100 AER non-worsening volume for the site 10000
lt with the proposed tank to be provided to be constructed at the front corner of the proposed allotment,
connected into the existing system in Crank Street.
A check of the proposed lot shows that 400 SQM of roof area alone will fill the detention tank during the
100 AER event. The tank is shown on the attached drawings.
Further to this the development will comply with the maximum discharge flow rate of 25L/s for a single
kerb outlet for each of the proposed lots.
4.0 - WATER QUALITY MANAGEMENT
4.1 Operational Phase
The proposed development is not required to meet the Queensland Governments State Planning Policy
(July 2017) as the development site area does not exceed the 2,500m2 minimum.
4.2 Construction Phase
Management of stormwater runoff during construction and the implementation of an erosion & sediment
control program is necessary to avoid impacts to receiving waters from pollutants typically generated
during the construction phase. Typical pollutants are described in 1 below:
Table 1 – Pollutants Typically Generated During the Construction Phase
Pollutant Sources
Litter (Gross Pollutants) Paper, construction packaging, food packaging, cement bags.
Sediment Unprotected exposed soils and stockpiles during earthworks and building.
Hydrocarbons Fuel and oil spills, leaks from construction equipment.
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.
pH altering substances Acid sulphate soils, cement slurry and wash waters.
Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected] 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.