Original source · versioned page text
Att 8 - SWMP
Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.
This report was prepared by a representative of Switchback 48 Consulting
Switchback 48 Consulting
PO Box 151
CALOUNDRA QLD 4551
Telephone: +61 408 725 826
Email: [email protected]
Record of Issue
Issue Status Author Review and Approval Date
A DA Issue LPR LPR 19-04-17
This report may only be used for the purpose with which it was commissioned and in accordance with the contract
between Switchback 48 Consulting and Martoo Consulting Pty Ltd. The scope of services is defined by the requests of the
client, time and financial agreements. Switchback 48 Consulting accepts no liability or responsibility whatsoever for or in
respect of any use of or reliance upon this report by any third party. Unauthorized use of this report in any form
whatsoever is prohibited.
SWMP – 11-19 Hilton Tce Tewantin 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.