Plans and drawings: the text below has words only, no drawings.
Very large file (24.4 MB): may take a few minutes to open.
.
COPYRIGHT: Drawings remain the Copyright of the Architect: Shaun ROOF DRAINAGE: All downpipes to be located as noted on the
SD 000.00 coversheet 02/03/2026 Key Value Keynote Text Lockyer drawings and sizes as scheduled. Allow to connect to in-ground storm
SD 000.01 general contents and notes 02/03/2026 water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
SD 010.05 existing images 02/03/2026 abs01 aluminum batten screening ALL WORKS shall be carried out in accordance with the Building Code I.O.'s at each change of direction and at 6000mm centres.
SD 010.10 reference images 02/03/2026 awn01 folded aluminium awning panel of Australia, Australian Standards, Local Council requirements, QDC
SD 010.11 reference images con01 exposed aggregate concrete guidelines and all other relevant by laws and authorities. In particular SITE DISCHARGE: All stormwater and sanitary plumbing to be
SD 010.12 material and finishes - exterior 02/03/2026 con02 class 1/2 off-form concrete refer Australian standards: connected to existing council system in accordance with the
SD 050.00 3D perspectives cover 28/01/2026 con03 board-form concrete
ꞏ site preparation A.S. 3798 requirements of the relevant local authority.
SD 050.01 3D perspectives 28/01/2026 con04 honed concrete - tbc
SD 050.02 3D perspectives 28/01/2026 fen01 painted lapped and capped paling boundary fence
ꞏ concrete construction A.S. 2870
SD 050.03 3D perspectives 28/01/2026 gls01 clear low e door/window glass ꞏ timber construction and details A.S. 1684.2 WATER LINES: All hot water lines shall be fully insulated. All domestic
SD 050.09 3D perspectives 02/03/2026 gls03 clear low e louvre glass ꞏ steelwork AS 4100, AS 1111 and A.S. 1112 hot water to basins, showers and baths to have maximum temperature
SD 100.00 site and locality plan 02/03/2026 lpb01 general plasterboard . termite protection BCA and A.S. 3660.1 of 50°C. Allow to supply and install tempering valves where required,
SD 100.01 site demolition plan 02/03/2026 mdp01 metal downpipe . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680 as nominated in the BCA and relevant standards.
SD 110.02 area plans - site cover 02/03/2026 meg01 eaves gutter + gutter guard . fire safety BCA part 3.7
SD 110.03 site setback 02/03/2026 mtf01 custom folded metal flashings
. smoke alarms BCA part 3.7.2 and A.S. 3786 STAIR AND BALUSTRADES: All stair and balustrades shall comply
SD 110.04 site max height 02/03/2026 mts01 metal roof sheeting
. glazing BCA part 3.6 and A.S. 1288 and A.S. 2047 with part 3.9 of the BCA. Steps to be provided where fall from dwelling
SD 110.05 site existing - comparison 02/03/2026 mts03 steel folded plate/flashing
SD 110.10 area plan GFA 02/03/2026 mwc01 metal wall cladding exceeds 190mm.
SD 110.11 area plan GBA 02/03/2026 rnd01 painted course render (tyrolean UNO) APPROVAL: No building work shall be undertaken prior to Building
SD 200.00 ground floor plan 02/03/2026 stn01 large stepping paver Approval by a registered Certifier. ALL PRODUCTS: To be installed to manufacturers requirements and
SD 200.01 first floor plan 02/03/2026 til01 natural stone tile to be in accordance with manufacturers requirements for suitable
SD 210.00 roof plan 02/03/2026 tim01 internal timber flooring CONSULTANTS: Drawings shall be read in conjunction with engineers exposure levels.
SD 300.00 eastern elevation 02/03/2026 tsh01 shiplap/hardwood wall and ceiling lining drawings and computations. All structure to Engineers design.
SD 300.01 northern elevation 02/03/2026
Hydraulic sizing and design to hydraulic engineers requirements. All PROPRIETARY ITEMS: Identification of a proprietary item does not
SD 300.02 southern elevation 02/03/2026
SD 300.03 western elevation 02/03/2026
drawings to be co-ordinated with consultant documentation prior to necessarily imply exclusive preference for the item so identified, but
SD 310.00 boundary elevations 02/03/2026 construction. indicates the necessary properties of the item. If alternatives are
SD 310.01 boundary elevations 02/03/2026 proposed, submit proposed alternatives and include samples, available
SD 310.02 boundary elevations 02/03/2026 DIMENSIONS: Do not scale off drawings - use figured dimensions only. technical information, reasons for proposed substitutions and cost.
SD 310.03 boundary elevations 02/03/2026 Contractor shall verify all dimensions on site prior to construction. Any
SD 400.00 section 01 02/03/2026 discrepancies or errors shall be referred to architect and client prior to TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with
SD 400.01 section 02 02/03/2026
installation / manufacture of any works. Confirm levels & RL's on site silicone rubber. Grout for wall: Epoxy based mildew resistant. Grout for
SD 400.02 section 03 02/03/2026
SD 400.03 section 04 02/03/2026
prior to commencement of work. floors: prepared grout to be acid resistant. all wall tiles to have
SD 400.04 section 05 02/03/2026 fcsubstrate.
SETOUT: Contractor to confirm exact siting and orientation prior to
construction setout. All building setout and confirmation of setbacks INTERNAL PAINTING: Unless noted otherwise paint system to be
general construction notes
architectural drawing list
and height to be carried out by a Licensed Surveyor. No footing, or wall Dulux approved 3 coat system - low sheen finish. Colours to be
to encroach the title boundary. supplied by Architect during contract and applied as per Dulux's
architectural legend
recommendations and guidelines.
TERMITE PROTECTION: Termite protection by means of termimesh
s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
installed in strict accordance with current manufacturers specifications. including: kitchen cabinets and cupboards; bathroom cabinets; robes.
STRUCTURAL STEEL: Unless noted otherwise all exposed SANITARY COMPARTMENTS: Provide removable hinges to doors of
structuralsteel, anchor bolts and other attachments shall be hot dip sanitary compartments to comply with BCA 3.8.3.3 and be readily
galvanised. A cold gal painted finish shall be applied to any field removable from outside unless there is a clear space of at least
welding to existing or new steelwork. All steel work cast in concrete 1200mm b/w closet pan within the sanitary compartment and the
footings or slab shall have a bitumen finish applied to full extent of cast nearest part of the doorway.
in concrete steel. Check all dimensions on site prior to fabrication of
steelwork. APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
equipment locations on site and with joiner. installation and final
RETAINING WALLS: All retaining walls to structural engineers details. connection by the contractor.
Provide rubble backfill and agg drainage to all retaining walls. Builder to
provide tanking where required. WEATHERSTRIPS: All external doors to contain weather stripping
(type to be confirmed by Architect prior to manufacture)
SLAB & FOOTINGS: All slabs and footings to structural engineers
details. A polyethylene moisture barrier shall be lapped 200mm and DOCUMENTATION: The contractor shall carry out works in
fully taped under any habitable concrete slab and shall extend 100mm accordance with the signed drawings and schedules and anything
onto the perimeter footing. reasonable inferred, and with the Conditions of Contract, and in
accordance with the directions and to the satisfaction of the Architect,
ARTICULATION JOINTS: Provide articulation joints to comply with whose interpretation of the contract documents shall be final. The
"Cement and Concrete Association Construction Note TN9". drawings and specifications/schedules shall be considered
complementary, and any
EROSION CONTROLS: All building works to comply with local work and/or materials absent from one but present or implied in the
authorities Erosion and sediment control standards. other shall be furnished as if they were present in both.
WATERPROOFING: All wet areas and walls to be waterproofed in FINAL CERTIFICATE: At completion of work, Builder to obtain and
accordance with the BCA 3.8 & AS 3740. Builder to provide certificate supply a Certificate of Classification from a Building Certifier.
of installation and compliance.
POOL: Contractor to confirm heights/depths/steps and
CONCEALMENT OF SERVICES: All services shall be concealed in plumbing/electrical requirements and locations prior to construction
walls or ducts. Where services are exposed they must be confirmed by
the Designer on site prior to installation unless noted otherwise.
LICENSED TRADESPERSONS: All services to be installed by licensed
tradespersons in accordance with local authority and with current
manufacturers specifications.
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0285
C 28/01/2026 pre-lodgment meeting 20 Peregian Esplanade Tom du Preez and Billie-Jay Porter du Preez SD 000.01 F SCALE 1:1
D 02/02/2026 pre-lodgment meeting - pricing Peregian Beach, QLD 4573
A3
general contents and notes
E 27/02/2026 DA lodgement - client review
F 02/03/2026 DA lodgement
schematic design 1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Architectural Proposal Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 24.4 MB (very large file)