                                                                                                                      the termite barriers. Provide moisture barrier (200UM) under                 with AS 2589 and finished to level 4 standard. Ceiling and wall           confirmation of building setout and heights.
                                                                                                                      slab with 200mm laps. Securely tape joints.                                  lining junction to be square set.
¿ play your part - print on recycled paper
                                                 Notes and Conditions                                                                                                                              Internal Linings (Wet areas)                                              Energy Efficiency
Drawing Schedule                                                                                                      Framing
                                                 General Notes                                                                                                                                     6.0mm Villaboard fixed in accordance with manufacturers                   The house is to have an energy assessment carried out by an
                                                                                                                      All timber framing to be in accordance with BCA 3.4, the
No:        Drawing Name                          These schedules are to be read in conjunction with architectural                                                                                  specification. Waterproof all wet areas in accordance with AS             accredited professional to verify that the building complies as a
                                                                                                                      Building Act 1975 and AS 1684.2 National Timber Framing Code
1.0               Notes                          drawings, structural engineer and hydraulic engineer drawings                                                                                     3740                                                                      energy rating of not less than 6 stars as per the requirements of
                                                                                                                      N3 and in accordance with engineers design and detail. All
1.1               Notes                          and any other external consultants. Any discrepancy with these                                                                                                                                                              the Queensland Development Code (QDC) MP 4.1.
                                                                                                                      external timber to be H3 treated or natural durable hwd timber.
1.2               Site plan                      schedules or other documentation is to be referred to the                                                                                         Ceiling Framing
                                                                                                                      All internal structural timber to be h2 treated.
1.3               Floor plan - GF                designer for written direction prior to the commencement of                                                                                       TS20 ceiling battens typical @450mm max. centres.                         The building shall have a energy efficient lighting to a min. of
1.4               Roof plan                      works. All works to be in accordance with the Building Act 1975,                                                                                                                                                            80% of all fittings as per the requirements of the QDC.
                                                                                                                      Masonry
1.5               Dimension plan - GF            Standard Building Regulation, Building Code of Australia,                                                                                         Fire safety
                                                                                                                      Masonry to comply with BCA 3.3 and AS3700-2001 and to be in
                  Electrical plan - Lighting -   Queensland Development Code, Local government regulations                                                                                         Fire separation to be provide in accordance with BCA 3.7.1                Any air conditioning installed in the premises is to have an EER
1.6
                  GF                                                                                                  accordance with engineers design and detail. Provide
                                                 and relevant Australian Standards. The Builder is to clarify all                                                                                  where applicable. Smoke alarms to be in accordance with BCA               of at least 2.9 as per the requirements of the QDC.
                  Electrical plan - Services -                                                                        weatherproofing in accordance with BCA 3.3.4.
1.7
                  GF                             dimensions on site prior to the commencement of any works.                                                                                        3.7.2.
3.1               Section A                      The author of the drawings takes no responsibility for details as                                                                                                                                                           All shower roses are to have a min. 3 star water efficiency
                                                                                                                      Wall cladding
3.2               Section B                      shown if changes are made during or prior to construction                                                                                         Light and Ventilation                                                     labelling and standards rating as per the requirements of the
                                                                                                                      All external lined walls to be in accordance with BCA 3.5.3. All
5.1               Schedules                      without written notice or approval. Do not scale off plans use                                                                                    Light and ventilation to be in accordance with BCA 3.8.4 & 3.8.5.         QDC.
                                                                                                                      wall cladding systems and fixings to be in accordance with
5.2               Schedules                      figure dimensions only. The maximum height of construction is
                                                                                                                      manufacturers specifications.
5.3               Schedules                      to comply with local authority planning scheme (excluding                                                                                         Floor Wastes                                                              All toilet cisterns are to be dual flush and to have a min. 4 star
                                                 relaxations as per town planning approval).The author takes no                                                                                    Floor wastes to be provided to all wet areas with floors graded           water efficiency labelling and standards rating as per the
                                                                                                                      Roof Construction
                                                 responsibility for cut/fill levels resulting from the documented                                                                                  to floor wastes.                                                          requirements of the QDC.
                                                                                                                      Timber & steel roof framing to be in accordance with structural
                                                 levels and contours. The Builder is to comply with statutory and
                                                                                                                      engineers design and detail. Roof cladding to be 0.42mm
                                                 contractual environmental protection requirements. The builder                                                                                    Stairs and Balustrades                                                    All tapware servicing kitchens, laundry tubs and basins are to
                                                                                                                      COLORBOND® steel BlueScope Lysaght CUSTOM ORB® and
                                                 shall verify all existing structure prior to commencement of                                                                                      Stairs and balustrades to be in accordance with BCA 3.9.2.                have a min. 3 star water efficiency labelling and standards rating
                                                                                                                      TRIMDEK® roof sheeting to be fixed in accordance with
                                                 works, any discrepancies are to be reported to the designer and                                                                                   where required.                                                           as per the requirements of the QDC .
                                                                                                                      manufacturers specifications to be fixed in accordance with
                                                 engineer for written direction.
                                                                                                                      manufacturers specifications. Roof framing to be in accordance
                                                                                                                      with structural engineers design and detail.                                 Setout                                                                    In a new class 1 building hot water is supplied by a–
                                                 Services                                                                                                                                          House to be setout by a registered surveyor. Surveyor to                  (a) heat pump or a solar hot water system that is eligible to
                                                 Builder to locate all services before commencement of                                                                                             provide certificate at frame and completion stage for                     receive:
                                                                                                                      Rainwater Goods
                                                 construction. Waste services connection to existing on                                                                                            confirmation of building setout and heights.                              (i) in a building with 3 or more bedrooms, at least 22 Renewable
                                                                                                                      All gutters and downpipes to be in accordance with
                                                 sewerage system and to comply with local authority regulations                                                                                                                                                              Energy Certificates; or
                                                                                                                      manufacturers specifications and BCA 3.5.2. Provide fall of min.
                                                 and Water Supply Act 1949. Roof water to discharge via                                                                                                                                                                      (ii) in a building with less than 3 bedrooms, at least 14
                                                                                                                      1:500 for eave gutter and 1:100 for box gutters. All internal box
                                                 downpipes to street channel in accordance with local authorities                                                                                  Energy Efficiency                                                         Renewable Energy Certificates; or
                                                                                                                      gutters to have overflow spitters at all rain water outlets.
                                                 regulations and hydraulic engineers design and detail.                                                                                            The house is to have an energy assessment carried out by an               (b)gas hot water system with an energy rating of at least five
                                                                                                                      Downpipes to be spaced not more than 12m and within 1.2m of
                                                                                                                      valley gutters. All storm water disposal to be in accordance with            accredited professional to verify that the building complies as a         stars.
                                                 Excavation                                                                                                                                        energy rating of not less than 6 stars as per the requirements of         (Note: Renewable Energy Certificates are issued under the
                                                                                                                      hydraulic engineers design and detail. All roof drainage systems
                                                 All earthworks are to be in accordance with engineers design                                                                                      the Queensland Development Code (QDC) MP 4.1.                             Commonwealth Government’s Mandatory Renewable Energy
                                                                                                                      and fixings to be in accordance with manufacturers
                                                 and detail, AS 3798 and BCA 3.1.1. Site drainage to be in                                                                                                                                                                   Target.). The unit shall be located as close as practical to the
                                                                                                                      specifications. All storm water drainage to be in accordance with
                                                 accordance with BCA 3.1.2 The contractor is to verify all levels                                                                                  The building shall have a energy efficient lighting to a min. of          main bathroom in accordance with the Queensland Plumbing
                                                                                                                      hydraulic engineers design and detail.
                                                 and dimensions, before commencement of work and any                                                                                               80% of all fittings as per the requirements of the QDC.                   and Wastewater Code.
                                                 discrepancies shall be reported to the designer before
                                                                                                                      Windows & Glazing
                                                 continuing. Any difference between the soil conditions                                                                                            Any air conditioning installed in the premises is to have an EER          Safety Notes
                                                                                                                      Windows and glazed doors are to be selected aluminium framed                                                                                           Falls, slips, trips
                                                 encountered on the site and the documentation shall be                                                                                            of at least 2.9 as per the requirements of the QDC.
                                                                                                                      with selected clear anodised finish to comply with AS 2047. All                                                                                        Working at heights during construction
                                                 reported to the Engineer before continuing site preparation.
                                                                                                                      fixings to comply with AS 1288 and AS 2047 for the nominated                                                                                           Wherever possible, components for this building should be
                                                 Finished ground levels to fall 1:20 for 1m from perimeter of                                                                                      All shower roses are to have a min. 3 star water efficiency
                                                                                                                      wind category. Site measure openings prior to ordering                                                                                                 prefabricated off-site or at ground level to minimise the risk of workers
                                                 building.                                                                                                                                         labelling and standards rating as per the requirements of the
                                                                                                                      windows. All glazing to be in accordance with BCA 3.6                                                                                                  falling more than two metres. However, construction of this building will
                                                                                                                                                                                                   QDC.                                                                      require workers to be working at heights where a fall in excess of two
                                                 Footings and Slab                                                                                                                                                                                                           metres is possible and injury is likely to result from such a fall. The
                                                                                                                      Insulation
                                                 Footings and slab construction shall to be in accordance with                                                                                     All toilet cisterns are to be dual flush and to have a min. 4 star        builder should provide a suitable barrier wherever a person is required
                                                                                                                      Roof insulation to have R1.3 55mm Permastop® Building
                                                 engineers design and detail and BCA 3.2. Slab on ground is to                                                                                     water efficiency labelling and standards rating as per the                to work in a situation where falling more than two metres is a possibility.
                                                                                                                      Blanket and Pink® Ceiling Batts R3.0 as manufactured by
                                                 be monolithic to be in accordance with engineers design and                                                                                       requirements of the QDC.
                                                                                                                      Fletcher Insulation to all ceilings. All insulation to be installed in                                                                                 Working at heights during operation and/or maintenance
                                                 detail and AS 2870 to provide a termite barrier. Termite barriers
                                                                                                                      accordance with manufacturers specifications.                                                                                                          Cleaning and maintenance of windows, walls, roof or other components
                                                 to comply with AS 3660.1 and BCA 3.1.3. Approved 'Kordon'                                                                                         All tapware servicing kitchens, laundry tubs and basins are to
                                                                                                                      Wall Batts R2.5 as manufactured by Fletcher Insulation to all                                                                                          of this building will require persons to be situated where a fall from a
                                                 termite barriers are required to perimeter and penetrations of                                                                                    have a min. 3 star water efficiency labelling and standards rating
                                                                                                                      external framed walls. All framed walls to have Sisalation® wall                                                                                       height in excess of two metres is possible. Where this type of activity is
                                                 new and modified slabs. All installation and application of the                                                                                   as per the requirements of the QDC .
                                                                                                                      wrap light duty. All insulation to be installed in accordance with                                                                                     required, scaffolding, fall barriers or Personal Protective Equipment
                                                 termite management systems are to be carried out in strict                                                                                                                                                                  should be used in accordance with relevant codes of practice,
                                                                                                                      manufacturers specifications.
                                                 accordance with the manufacturers specifications - guarantees                                                                                     In a new class 1 building hot water is supplied by a–                     regulations or legislation.
                                                 are required by the owner from the manufacturer / installer of                                                                                    (a) heat pump or a solar hot water system that is eligible to
                                                                                                                      Ceiling Linings
                                                 the termite barriers. Provide moisture barrier (200UM) under                                                                                      receive:                                                                  Anchorage points for portable scaffold or fall arrest devices have been
                                                                                                                      10mm gyprock sheeting typically. Linings fixed in accordance
                                                 slab with 200mm laps. Securely tape joints.                                                                                                       (i) in a building with 3 or more bedrooms, at least 22 Renewable          included in the design for use by maintenance workers. Any persons
                                                                                                                      with AS 2589 and finished to level 4 standard. Ceiling and wall                                                                                        engaged to work on the building after completion of construction work
                                                                                                                      lining junction to be square set.                                            Energy Certificates; or
                                                  Framing                                                                                                                                          (ii) in a building with less than 3 bedrooms, at least 14                 should be informed about the anchorage points.
                                                  All timber framing to be in accordance with BCA 3.4, the                                                                                         Renewable Energy Certificates; or
                                                                                                                      Wall Linings                                                                                                                                           Slippery or uneven surfaces
                                                  Building Act 1975 and AS 1684.2 National Timber Framing Code                                                                                     (b)gas hot water system with an energy rating of at least five
                                                                                                                      10mm gyprock sheeting typically. Linings fixed in accordance                                                                                           Floor finishes
                                                  N3 and in accordance with engineers design and detail. All                                                                                       stars.                                                                                  /Users/benthornton/Dropbox/My Mac (Bens-iMac)/Documents/Cadfiles/2001 -
                                                                                                                                                                                                                                                                             Where specified finishes have been selected Kirkman/Archicad/20092021/2001.pln
                                                                                                                                                                                                                                                                                                                                to minimise the risk of
                                                                                                                      with AS 2589 and finished to level 4 standard. Ceiling and wall
                                                  external timber to be H3 treated or natural durable hwd timber.                                                                                  (Note: Renewable Energy Certificates are issued under the                 floors and paved areas becoming slippery when wet or when walked on
                          sbt designs pty ltd t/a                                                                     lining junction to be square set.
                          Skale Building Design   All internal structural timber to be h2 treated.
                                                                             project       Residence                                       lot no.                                              --Commonwealth
                                                                                                                                                                                                            P1    BA IssueGovernment’s Mandatory Renewable Energy            with wet shoes/feet.   Any changes
                                                                                                                                                                                                                                                                                              13/8/21
                                                                                                                                                                                                                                                                                                         projecttonumber
                                                                                                                                                                                                                                                                                                                      the specified finish should be
                          Mobile: 0412 025 657                                                                                                                                                     Target.).
                                                                                                                                                                                                           CD01 The   unit shall
                                                                                                                                                                                                                             issue be located as close as practical to the   made in consultation
                                                                                                                                                                                                                                                                                              22/1/20with the designer or, if this is not practical,
                                                                                for         David & Jan Kirkman Internal Linings (Wet        plan  no.
                                                                                                                                                areas)                                          --                Conceptual
                                                                                                                                                                                                                                                                                                         2001
                                                        Masonry                                                                                                                                    main bathroom in accordance with the Queensland Plumbing                  surfaces with an equivalent    or better slip resistance should be chosen.

skale
                                                                                                                         6.0mm Villaboard fixed in accordance with manufacturers
                          skale.com.au                  Masonry to comply with BCA 3.3 and U2/16
                                                                                            AS3700-2001 Barbados
                                                                                                           and to be in Court                drawn
                                                                                                                         specification. Waterproof all wet areas in accordance with AS
                                                                                                                                                                                               BTand Wastewater Code.                                                                                    drawing number
                          [email protected]             accordance with engineers design and detail. Provide                                                                                                                                                                 The owner is responsible for the selection of surface finishes in the
      building design                                                           at
                                                        weatherproofing in accordance
                          A.C.N. 123 976 296 QBCC: 1143 609                                 Noosa
                                                                                      with BCA 3.3.4. Sound
                                                                                                                         3740                scale (A3)                          1:100, 1:1       Rev  Details
                                                                                                                                                                                            Safety Notes
                                                                                                                                                                                                                                                                                                Date
                                                                                                                                                                                                                                                                             pedestrian trafficable      1.0                P1
                                                                                                                                                                                                                                                                                                    areas of this building. Surfaces should beBuilding Design
                                                                                                                                                                                                                                                                                                                                       © Skale

                                                                                                                                                                                                   Falls, slips, trips                                                       selected in accordance with AS HB 197:1999 and AS/NZ 4586:2004.
Log in to download the original file

Architecturals 13.08.21.pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.