Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Callaghan and Toth IWMP Report revised

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Civil, Environmental &
Hydraulic Engineers


[OCR of page images]
 

ROOFWATER DOWNPIPE

 

SCREENED OVERFLOW PIPE

TO DETENTION BASIN THEN fo
TO BIORETENTION BASIN SCREEN

SUPPLY OFF TAKE
TO TOILET
FLUSHING COLD
WATER WASHING

 

MACHINE AND Bo : :
LANDSCAPING Nu

 

FIRST FLUSH DIVERSION

“oe TO GARDEN BEDS

 

 

©

20% POTABLE WATER VALVE SHUT OFF LEVEL

10% FLOAT SWITCH/POTABLE
WATER VALVE ACTIVATION LEVEL

 

 

 

 

project
Callaghan & Toth | PROPOSED CARTWRIGHT VILLAGE
EXTENSION — CARRAMAR

Civil, Environmental & .
Hydraulic Engineers location

8/41 Sunshine Beach Road 186 COOROY NOOSA ROAD,
P.0. Box 2305 TEWANTIN

} NOOSA HEADS 4567
l Ph: 54749081

—

TYPICAL RAINWATER TANK

Figure 4.2

 

www.callaghanandtoth.com.au

 

ScaleNTS

 

 
Log in to download the original file

Callaghan and Toth IWMP Report revised.pdf · 7.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.