DELEGATED REPORT
PLANNING ASSESSMENT BRANCH

REQUEST FOR NEGOTIATED DECISION NOTICE

Application no:	OPW15/0169
	
Project Manger:	Monkeith Kadhum - Development Engineer
	

SUMMARY:

APPLICATION DETAILS
Application Number:	OPW15/0169
Applicant:	Pacific BCQ
Representations Received Date:	19 November 2015
Original Approval Type:	Development Permit for Operational Work - Driveway, Storm Water Drainage, Earthworks and landscaping
Number of Submissions for Original Application:	No Submission

PROPERTY DETAILS
Property Address:	12 Stevens St SUNSHINE BEACH  QLD  4567
RP Description:	Lot 694 RP 48111
Land Area:	506 Square Metres
Existing Use of Land:	Dwelling House

BACKGROUND:
A Preliminary Approval for Operational Work - Driveway, Storm Water Drainage, Earthworks and landscaping was issued on 27 October 2015.

The applicant agreed that Council issue a Preliminary Approval in order allow the owner/developer time to pay the required Performance Bond in compliance with Condition 6 of the higher order approval MCU15/0049.

ASSESSMENT:
The Preliminary Approval included one condition only that reads as follow:

Prior to the issue of a Development Permit for Operational Works, payment of the Performance Bond as described in Condition 6 of the higher order Development Permit for Material Change of Use, Council Reference MCU15/0049 dated 11 August 2015, must be made to Council.

Applicant’s Representation
The applicant advises in the submitted Representation that the payment of $10,000 Performance Bond has been made on 19 November 2015 (by Bark Design Architects -BAGS006386), and requests that Council issues a Negotiated Decision Notice for a Development Permit for Operational Works.

Assessment of Representation
Given that the applicant has addressed the condition of the preliminary approval regarding the required payment of Performance Bond, a Development Permit for Operational Works with conditions can be issued by Council.

Recommendation
The applicant has fully address the condition of the Preliminary Approval and the approval now can be changed to a Development Permit subject to conditions.

RECOMMENDATION

AGREE to the representation submitted in relation to Application No. OPW15/0169, situated at 12 Stevens St SUNSHINE BEACH QLD 4567, and agree to issue a Negotiated Decision Notice to the applicant as follow:

A.	Change the approval description/type (DECISION DETAILS) to the following:
Development Permit for Operational Works (Driveway, Stormwater Drainage, Earthworks and Landscaping)

B.	Remove the Condition of the Preliminary Approval:-
Prior to the issue of a Development Permit for Operational Works, payment of the Performance Bond as described in Condition 6 of the higher order Development Permit for Material Change of Use, Council Reference MCU15/0049 dated 11 August 2015, must be made to Council.

C.	Include Conditions, Advisory Notes and other items required for the Development Permit

D.	Attach Approved Plans to the Negotiated Decision Notice

E.	Issue a Negotiated Decision Notice

PROJECT MANAGER

Signature:	
	
Position:  Development Engineer	Date: 26 November 2015

[Attachment: image1.png (image text)]
 
 
 

 
 
 

a
mm

  

NOOSA
COUNCIL

Used in these records

About this file

File size
54 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0169 - Negotiated Report.docx · 54 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.