The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.

The open space and setback areas are to be landscaped in accordance with
Council’s Policy on Landscaping Guidelines and a properly prepared landscape
plan. Such landscaping is to be completed prior to the premises being occupied
and maintained at all times thereafter to the reasonable satisfaction of the
Manager of Planning.

Any fencing provided in conjunction with the development is to be setback an
average of two (2) metres to any road frontage pursuant to clause 36 (6) (c) of
the Schedule to the Planning Scheme.

Existing trees on the site and within road reserves are to be retained, except
where required to be removed due to building operations or the conduct of the
approved use. The landscape plans referred to above are to denote areas of
existing vegetation or existing trees proposed to be retained.

The developer must submit security in the form of a cash bond or trading bank
guarantee to the sum of $2000 to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for building works. The
cash bond or trading bank guarantee will be returned on performance of the
conditions of approval.

The requirements of this development approval are to be effected, prior to the
use of the premises. Council reserves the right to call upon the bond or
guaranteed sum referred to in this approval to effect compliance with conditions.

This Development Permit for a material change of use of premises lapses if:-

23.1 the use or erection of a building or other structure associated with the
use, has not been commenced within four (4) years of the date of issue of
the Development Permit, unless application is made and approved by
Council for an extension; or

23.2 the use of any premises pursuant to the Development Permit ceases.

Prior to the commencement of development, the developer must obtain the
following Development Permits:-

24.1 Development Permit for building works;
24.2 Development Permit for plumbing and drainage works;

24.3 Development Permit for operational works of landscaping, carparking
and access;

B. Grant a Development Permit for Material Change of Use for the application.

PO-3 g:\rowena\12612da-rs.doc 24/08/98

Used in these records

About this file

File size
4.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Report 12612 DA.pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.