SUPERSEDED - Approved Decision Notice - RAL21 0026 & OPW21 0303
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
TS2122-POD B Plan of Development, prepared by Colston 18/10/2021
Surveyors
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Currency Period
5. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 20 May 2026, unless
an application to extend the currency period is approved by Council.
Boundary Encroachments
6. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
ENGINEERING
Site Access and Driveways
7. Two sealed access driveways (one to each of the proposed lots 31 and 32) must be provided
from Currawong Cres to all parking and manoeuvring areas of the development. The works
must be undertaken in accordance with the conditions of this approval and must include in
particular driveway crossovers generally in accordance with Councils standard drawings RS-
049 and RS-050.
Stormwater Drainage
8. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this approval.
Services
9. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
10. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
11. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Page 2 of 17
Document Set ID: 21939337
Version: 4, Version Date: 26/05/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.