SUPERSEDED - Approved Decision Notice - RAL21 0026 & OPW21 0303
Final Inspection
49. A final inspection and approval of the works and completed reinstatement works by Council’s
Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 4, The agency provided its
at DILGP Via MyDAS2 Division 3, Table 1 response on 12
at https://prod2.dev- (Planning Regulation November 2021
assess.qld.gov.au/suite 2017): Premises (Reference No. 2111-
/ (for assistance, contaminated because of 25753 SRA. A copy of
contact DILGP at 5352 unexploded ordnance the response is
9701 or attached.
email:[email protected]
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
General Advisory Notes
2. As these driveways are private structures, the owner bears full responsibly for the standard
of its construction, maintenance and any liabilities associated with its construction. It is
recommended that professional advice be sought for the construction of the driveway to
ensure that the driveway is constructed generally in accordance with standard drawings RS-
049 and RS-050.
3. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
4. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
5. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart and Inspections Request
6. Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5
business days’ notice of preferred inspection time.
Page 7 of 17
Document Set ID: 21939337
Version: 4, Version Date: 26/05/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.