Skip to the record
The gold standard in government transparency.

Council archive · source document

07/2174 - MCU - Multiple Housing Type 4 - Conventional 5 Units [As Published] · 132007.2174

of 72

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schedule 8, part 1, table 5, tem 1
IP Regulation, schedule 2, table 2, tem 11
IP Regulation, schedule 1, table 5, item 2 {wild river area)
Water Act 2000, section 966C
Wild Rivers Act 2005, section 43A

seommenece saree ren oe rr ne ee ane g

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

<a ee an Le ed
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No

(1 Yes

IPA, schedule 8, part 1, table 2, item 7

IPA, schedule 8, part 1, fable 5, tems 3 and 4

IP Regulation, schedute 2, table 2, items 1 and 23

Environmental Protection Act 1994, section 73AA {wild river area)
Witd Rivers Act 2005, section 43A

 

 

[WITHIN THE LIMITS OF A PORT “|
414 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

No

OD Yes

IP Regulation, schedule 2, table 2, items 15 and 16 eo
DECLARED ISHHABITAT AREA OTT — . — ee "]

 

1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No

[Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, item 26

 

 

[COMMUNITY INFRASTRUCTURE

had

1.6 Is any part of the premises designated for community infrastructure?

No
(1 Yes

IP Regulation, schedule 2, table 3, tem 7

 

 

[WASTE WATER MANAGEMENT

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

No
C1 Yes

IP Regulation, schedule 2, table 3, tem 5

 

 

 

 

 

SECTION 2 - Section 2 must be completed when the application seeks approval to materially change the use of premises.
a ~—t

 

 

PLANNING SCHEME

21 ls the proposed use assessable under the planning scheme?

L]_ No - (Go to Question 2.2)
Yes - (Complete Part D of DAS Application Form 1 and answer Questions 2.1.1 - 2.1.14 below)

If yes, does the application request that the proposal be assessed against a superseded planning scheme?

(2) Yes- (Complete Attachment 1)
No

Used in these records

About this file

File size
6.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2174 - MCU - Multiple Housing Type 4 - Conventional 5 Units [As Published].pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.