Council archive · source document
Approval Package · 132000.200186.1
NOOSA COUNCIL IDAS Development Application Decision Notice 2
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Building
1. A verification survey is to be undertaken on the building by a Licensed Surveyor and a certificate lodged
with Council at completion of the work confirming compliance with the maximum building height above
natural surface, required by the provisions of the Town Planning Scheme.
2. The developer shall prepare at his expense, a geotechnical report and is to submit the report for appraisal
by Council’s nominated geotechnical consultant and for approval by the Manager of Building. The report
is to be accompanied by a fee of $1200 to cover the reasonable assessment costs of the consultant and
the Manager of Building. A Development Permit for building works must not issue until the report is
approved and any relevant findings incorporated into the design of the building works to the satisfaction of
the relevant assessment manager.
Land Development
3. Prior to occupation of the proposed dwelling, 2 off-street car parking spaces with a sealed access
complying with AS2890.1 - 1993 shall be provided.
4. The driveway shall be a maximum of 4.0 metres wide where it crosses the property boundary and the
balance of the driveway within the lot shall be the minimum area required to provide access to the
proposed garage. The remainder of the driveway within the footpath shall also have a maximum width of
4.0 metres.
5. Drainage of the garage and vehicle manoeuvring area shall be by gravity in accordance with Councils
Schedule to the Planning Scheme section 3.4.4.12.
6. Lot 21 on SP111721 was known to be in an area contaminated by unexploded ordinance. Any person
acting on this permit shall exercise care when excavating.
7. The proposed dwelling, building work or any construction shall not encroach into any areas depicted as
‘Natural vegetation in lots’ in the Plan of Development for this estate. Care shall be taken when
excavating that earthworks batters do not extend into these areas nor extend over the boundary alignment
at any other location.
8. All stormwater from roofs and impervious surfaces is to be collected and disposed of on site via an
infiltration pit. The pit shall be designed by a qualified Hydraulic Engineer to cater for a Q100 storm.
Design details shall be submitted in conjunction with an application for a Development Permit for
Operational Works (Drainage).
9. The alteration of any public utility or other facilities necessitated by the development of land or associated
construction works external to the site shall be at no cost to Council.
10. Any person acting on this permit shall be responsible for the prevention of erosion and sediment export
from the site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, may be necessary.
Land Use
11. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are numbered 25.401.1 to 25.401.1 prepared by Andrew McKellar
Design and dated April 2000 and as may be amended by these conditions.
12. This Development Permit for a material change of use of premises lapses if:-
12.1 the use or erection of a building or other structure associated with the use, has not been
commenced within four (4) years of the date of issue of the Development Permit, unless
application is made and approved by Council for an extension; or
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approval Package.pdfRelated documentApplication case desk ↗
About this file
- File size
- 244 KB (small file)
- File type
No other editions are linked here.