Original source · versioned page text
Consolidated Set Approved Plans - MCU24 0094 (As Published)
Plans and drawings: the text below has words only, no drawings.
Very large file (44.5 MB): may take a few minutes to open.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
1 2 3 4 5 6 7 8 9
general notes
6430 6100 1400 7930 2000 5740 12700 8500
00 "
° 49' 1 1 site boundary | 63.000 m appro
x | 93° 08' 00" 1
| 66 400.04 400.03 400.02 1. all works to be carried out in accordance
ox
ppr with the general construction notes in
setback
a
0m
2500
0 coversheets of this package.
10.0
ry | 2. all works to be carried out in accordance
nda
bou with the DA (if required) and BA including
site
drawings & conditions.
3. handrails are required to all stairways where
a change of level of 1000mm or greater
occurs as per BCA 2013 Part 3.9.2.4.
4. where boundary locations are not clear, the
builder shall arrange for survey to locate the
boundaries and complete an identification
x|
00 ro
survey prior to setting out the new work.
5' app
5. contours shown are existing and do not
"
°2 m
36 00
represent finished levels.
0.0
6. levels and services locations for civil works
|1
may vary from those shown - verify all levels
sb
high level planter and services locations prior to
a commencement of construction.
7. concrete profile and blockwork setout is
provided on 220 (series) of drawings, refer
high level window
to these for setout. licensed surveyor to
4430
l
1 sk establish grids. where discrepancies occur
400.00 the 220 series drawings are to take
precedent.
mtf01
spa01
b sb
|7
.0
30 00 m
3°
00 app
APPROVED PLAN
' 0 ro
0" x | mts01 MCU24/0094
l
4240
3° sk
ht NOOSA COUNCIL
ylig
sk
8 APRIL 2025
spa01
mtf01
c
sit
e
bo
un
da Lot 6
ry
RP216711
4240
|1 l lvg01
6.
25 sk
8
m
ap 3520m²
pr
ox
general items legend
|3 mtf01
spa01
d 09
°3
7' RL 60.200 spot level
30
" tos = top of step
bos = bottom of step
RL = lvl at point (AHD typ)
4290
l
sk
RL xx.xxx top of wall (surface) level
SSL xx.xxx structural slab level
e FFL xx.xxx finished floor level
sit
DN
e
window code. refer to window
bo
lvg01 L1 (level)
skl
un
w01 (window ref) elevations + door/window
d
RL 25.620
ar
t
5450
hardware schedules
y|
gh
yli
16
sk
.2
58
m
door/gate code. refer to
L1
ap
(level)
window elevations +
pr
lvg01 d01 (door/gate ref)
ox
door/window hardware
R
|3
f schedules
22
00 k
°
52
60 bac
O
'3
t mts01
se
0"
material code. refer finishes
2° Ipb01 Ipb01 schedule (typical).
S
(refer also to sanitary/
applicances/ lighting/services)
1
400.01
S component code.
9540
dp01 (refer material code for similar)
skylight
roof terrace
t
gh
til01 yli ceiling code
RL 24.120 sk
2700 * heights are relative to
C
height*
Ipb01 finish** assocaited finished floor
* refer finishes schedule
R
seat
joinery code. refer to
g
J0.1
level joinery
cabinetry elevations on 820
(series) and details on 830
E
reference
(series) drawings
site
03m
S
bou
10. 20 step down code. note step line
nda
high level planter occurs on low side of level
ry |
C
low lvl low lvl + 20 mm change
16.
562
2
58
RP48112
E
ma
hose cock. refer serivces
ppr
hc schedule. client to confirm
ox
locations
N
| 33
6°
07'
T
(cos) check on site
30"
(mir) mirrored detail
1 (sim) similar detail
400.05
(part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0427
RW
NM
A
B
15/04/24
30/05/24
SD Client Issue 01
SD Client Issue 02
33 Ross Crescent, L&S Hamill general arrangement SD 210.00 C SCALE As
indicated
Sunshine Beach
A3
RW C 17/06/24 SD Client Issue 03 roof plan
schematic design
1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Document Set ID: 23123221
Version: 1, Version Date: 24/07/2024
[OCR of page images]
general notes
2000 5740
site boundal
|
63.000 m 08" 00"
ia Popron | Pee 00 all works to be carried out in accordance
with the general construction notes in
coversheets of this package.
all works tobe carried out in accordance
withthe DA (if required) and BA including
drawings & conditions
handrails are required to all stairways where
a change of level of 1000mm or greater
occurs as per BCA 2013 Part 3.9.2.4
where boundary locations are not lear, the
builder shall arrange for survey to locate the
boundaries and complete an identification
survey prior to setting out the new work.
contours shown are existing and do not
represent fished levels.
levels and services locations for civil works
may vary from those shown - verify al levels
and services locations prior to
commencement of construction.
concrete profile and blockwork setout is
provided on 220 (series) of drawings, refer
to these for setout. licensed surveyor to
establish grids. where discrepancies occur
the 220 series drawings are to take
precedent.
APPROVED PLAN
MCU24/0094
NOOSA COUNCIL
8 APRIL 2025
Lot 6
RP216711
3520m?
general items legend
spot level
tos = top of step
bottom of step
RL = Wwlat point (AHD typ)
top of wall (surface) level
structural slab level
finished floor level
window code. refer to window
elevations + door/window
hardware schedules
ty (vet) | door/gate code. refer to
(WOT ttre ep window elevations +
| door/window hardware
schedules
material code. refer finishes
| schedule (typical).
(tefer also to sanitary!
| applicances!lightingiservices)
component code
(refer material code for similar)
ceiling code
* heights are relative to
assocaited finished floor
* refer finishes schedule
joinery code. refer to
562
RP48112
shaun lockyer architects
www.lockyerarchitects.com.au . 07 3257 7288
nominated architect: Shaun Lockyer 3455 QLD . 9377 NSW
\
DATE
15/04/24
30/05/24
17/06/24
cabinetry elevations on 820
(series) and details on 830
(series) drawings
20 | step down code. note step line
occurs on low side of level
toi Fw s2onm | change
hose cock. refer serivces
| schedule. cient to confirm
| locations
check on site
| miored detail
similar detail
| partial detial
PROJECTNO 0427
ISSUE PROJECT ‘CLIENT DRAWING NAME (| PHASE. DWG NO
SO Client ssue 02 33 Ross Crescent, L&S Hamill general arrangement | SD 210.00 C Bie fs
SD Client Issue 02 late lor 1eTo]
sssr® Sunshine Beach “ , re
_ 1:1@
Docdrrehestdtoine' 2999. Powepsions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Version: 1, Version Date: 24/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.