Decision Notice - DBW23 0016 · OPW24/0034
13. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
14. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
ENGINEERING
Site Access and Driveways
15. A sealed access driveway must be provided from Park Crescent to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and be generally in accordance with SCG’s Civil Works:
Driveway Plans & Details (33019-C2.1) dated March 2023.
Car Parking
16. A minimum of two (2) car parking spaces must be provided on the site. The works must be
undertaken in accordance with an Operational Works approval and must include in particular
dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities
Stormwater Drainage
17. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with SCG’s Civil Works: Stormwater Management
Plan (33019-SW1.1) dated March 2023.
Easements
18. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
19. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
20. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
21. All works must be carried out in accordance with the recommendations contained in SCG’s
Slope Stability Assessment (33019(SL)) and Soil Test and Footing Report (33019(S)) both
dated 15 March 2023.
Earthworks and Retaining Walls
22. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments.
Page 3 of 6
Document Set ID: 22407212
Version: 3, Version Date: 04/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - DBW23 0016.pdfRelated documentApplication case desk ↗
Decision Notice - DBW23 0016 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 153 KB (small file)
- File type
No other editions are linked here.