Traffic Engineering Report Proposed Hardware & Trade Supplies Development At the 178 Eumundi Noosa Road, Noosaville QLD On behalf of Bunnings Group Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 24 (of 73)
Section 2
About TTM
For 30 years, we’ve been at the centre of the
Australian development and infrastructure industry.
Our unique combination of acoustics, data, traffic
and waste services is fundamental to the success of
any architectural or development project.
We have over 50 staff, with an unrivalled depth of
experience. Our industry knowledge, technical
expertise and commercial insight allow us to deliver
an exceptional and reliable service.
T: (07) 3327 9500
F: (07) 3327 9501
E: [email protected]
Revision Record
No. Author Reviewed/Approved Description Date
1. D. Grummitt D. Grummitt (RPEQ 19356) DA Report 22/03/2022
2.
3.
4.
5.
© 2022 - TTM Consulting Pty Ltd ABN 65 010 868 621
Level 8, 369 Ann Street, Brisbane. PO Box 12015 George Street Brisbane 4003
Section 3
Contents
1 Introduction ..........................................................................................................................................4
1.1 Background .................................................................................................................................. 4
1.2 Scope ............................................................................................................................................ 4
1.3 Site Location ................................................................................................................................. 4
1.4 Development Profile .................................................................................................................... 6
2 Existing Transport Infrastructure ............................................................................................................7
2.1 The Road Network ........................................................................................................................ 7
2.2 Public & Active Transport Facilities .............................................................................................. 7
3 Vehicular Site Access Arrangements.......................................................................................................9
3.1 Design & Location......................................................................................................................... 9
3.2 Turn Warrant Assessment ..........................................................................................................10
4 Car Parking Arrangements ................................................................................................................... 11
4.1 Parking Supply ............................................................................................................................11
4.2 Car Park Layout ..........................................................................................................................11
5 Service Vehicle Arrangements .............................................................................................................. 13
6 Active Transport .................................................................................................................................. 14
6.1 Pedestrian Access .......................................................................................................................14
6.2 Cyclist Requirements ..................................................................................................................14
7 Traffic Impact Assessment ................................................................................................................... 15
7.1 Scope ..........................................................................................................................................15
7.2 Surveyed (2021) Traffic Volumes ...............................................................................................15
7.3 Background Traffic Growth ........................................................................................................15
7.4 Estimated Development Traffic ..................................................................................................15
7.4.1 Generation .....................................................................................................................15
7.4.2 Directional Distribution ..................................................................................................16
7.5 Site Accesses Analysis .................................................................................................................16
7.5.1 Existing Bunnings Northern Access ................................................................................16
7.5.2 Proposed Southern Access (Entry-only) .........................................................................17
7.5.3 Proposed Northern Access (Exit-only) ............................................................................17
7.6 Conclusion ..................................................................................................................................17
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 4
8 Summary and Conclusions ................................................................................................................... 18
8.1 Development Summary ..............................................................................................................18
8.2 Car Parking Arrangements..........................................................................................................18
8.3 Access Arrangements .................................................................................................................18
8.4 Service Vehicle Arrangements ....................................................................................................18
8.5 Active Transport Facilities ..........................................................................................................18
8.6 Traffic Impact Assessment .........................................................................................................19
8.7 Conclusion ..................................................................................................................................19
Appendix A Proposed Development Plans ................................................................................................ 20
Appendix B Gateway Drive Upgrade Preliminary Functional Layout Plan & Vehicle Swept Paths................ 21
Appendix C Traffic Volume Diagrams ....................................................................................................... 22
Appendix D Sidra Analysis Outputs ........................................................................................................... 23
Appendix E Code Responses .................................................................................................................... 24
Table Index
Table 2.1: Local Road Hierarchy ......................................................................................................................... 7
Table 3.1: Design Compliance Summary – Southern Entry-only Access ............................................................ 9
Table 3.2: Design Compliance Summary – Northern Exit-only Access ............................................................... 9
Table 3.3: Turn Warrant Assessment – Southern Entry-only Access ............................................................... 10
Table 4.1: Parking Supply Requirements.......................................................................................................... 11
Table 4.2: Parking Layout Design Compliance.................................................................................................. 12
Table 7.1: Estimated Peak Hour Development Traffic Generation .................................................................. 16
Table 7.2: SIDRA Analysis Summary – Existing Bunnings Northern Access ...................................................... 16
Table 7.3: SIDRA Analysis Summary – Proposed Entry-only Access ................................................................. 17
Table 7.4: SIDRA Analysis Summary – Proposed Exit-only Access .................................................................... 17
Figure Index
Figure 1.1: Site location ..................................................................................................................................... 5
Figure 1.2: Site area ........................................................................................................................................... 5
Figure 2.1: Gateway Drive Existing Conditions ................................................................................................... 8
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 5
1 Introduction
1.1 Background
TTM Consulting has been engaged by Bunnings Group Ltd Pty to prepare a traffic engineering report
investigating a proposed development being a Material Change of Use for Hardware and Trade Supplies. It is
understood that a Development Application will be lodged with Noosa Council.
1.2 Scope
This report investigates the transport aspects associated with the proposed development. The scope of the
transport aspects investigated includes:
• Parking supply required to cater for development demand
• Parking layout to provide efficient and safe internal manoeuvring
• Identification of likely traffic volumes and traffic distribution from the future development
• Identification of likely traffic impact of development on the public road network
• Site access configuration to provide efficient and safe vehicle manoeuvring between the site and the
public road network
• Internal development layout to provide efficient and safe internal manoeuvring for vehicles
To assess the proposed transport arrangements, the development plans have been assessed against the
following guidelines and planning documents:
• Noosa Council Planning Scheme (2020), specifically:
- Driveways and Parking Code
- Transport Code
- PSP6 Engineering Design Standards
1.3 Site Location
The site is located at Gateway Drive, Noosaville near the intersection of Eumundi Noosa Road, as shown in
Figure 1.1.The property description is Lot 101 on RP279285 and has an area of 2.793 hectares. The site has a
single road frontage to Gateway Drive and is currently vacant land.
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 6
Approximate
Site Location
Figure 1.1: Site location
Site
Figure 1.2: Site area
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 7
1.4 Development Profile The proposed development is for a standalone Hardware and Trade Supplies building to be operated by Bunnings as a bulk trade supplies facility. The proposed building includes two levels; a lower at-grade level containing an on-site car parking area and an upper level containing a drive-through bulk trade supplies area. The upper level has an overall gross floor area of 1,861m2. Accounting for the necessary vehicle and pedestrian circulation areas (773m2), the upper level has an effective floor area of approximately 1,088m2. A copy of the proposed development plans is included in Appendix A. Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 8
2 Existing Transport Infrastructure 2.1 The Road Network All roads in the immediate vicinity of the site are administered by Noosa Council. The hierarchy and characteristics of roads in the immediate vicinity of the site are shown below in Table 2.1. Table 2.1: Local Road Hierarchy Road Speed Limit Lanes Classification Gateway Drive 50kph 2 (undivided) Collector Eumundi Noosa Road 60kph 4 (divided plus parking) Arterial Gateway Drive has a 13m (approx.) wide carriageway at the site frontage. South of the site it includes single northbound and southbound travel lanes and channelised right turn lanes for the two existing Bunnings site accesses. ‘No Stopping’ conditions exist on both sides of the road from approximately midway along the site frontage to the south. The existing conditions are shown in Figure 2.1 below. The intersection of Gateway Drive and Eumundi Noosa Road is roundabout controlled. 2.2 Public & Active Transport Facilities Buses Bus stops are located on Eumundi Noosa Road, approximately 360m to the south of the site, with regular services to Noosa Junction Station. Bus routes 629 and 630 run every 15 minutes during the peak hours and 30 minutes off-peak. Pedestrians Concrete pedestrian footpaths are generally located on both sides of Gateway Drive but not along the site frontage. The nearest formal pedestrian crossing of Gateway Drive is located 50m to the south of the site. Cyclists Dedicated on street cycle lanes are located on both sides of Gateway Drive to the south of the site. The northbound lane ends approximately 130m south of the site and the southbound lane commences approximately 15m south of the site. Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 9
Site Figure 2.1: Gateway Drive Existing Conditions Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 10
3 Vehicular Site Access Arrangements
Two separate vehicular accesses are proposed to Gateway Drive including an entry-only crossover located
adjacent the southern site boundary and an exit-only crossover located adjacent the northern site boundary.
The provision of two accesses is necessary for the development due to the need to establish 1-way internal
circulation for the design vehicle (19m articulated vehicle).
3.1 Design & Location
Acceptable Outcome AO1.1 of Council’s Driveways and Parking Code requires vehicular access to be designed
and located in accordance with the Australian Standards for Parking Facilities (AS/NZS 2890.1:2004 and AS
2890.2:2018). Tables 3.1 and 3.2 summarise the design and location compliance of the proposed accesses.
As indicated, the design and location of both accesses complies with the standards. As demonstrated in TTM
drawing 21BRT0226-03A (Appendix B) the access layouts and widths accommodate the swept path of the
adopted design vehicle (19m articulated vehicle).
Table 3.1: Design Compliance Summary – Southern Entry-only Access
Design Aspect Council Requirement Proposed Provision Compliance
Distance from an 6m 130m Compliant
intersection
Type Heavy duty in accordance with IPWEA Heavy duty in accordance with Compliant
standard dwg. RD-S-051 IPWEA standard dwg. RD-S-051
Width Adequate for design vehicle swept path 9.5m Compliant
Gradient 1:20 (5%) first 6.85m 1:20 (maximum) Compliant
Minimum Queuing 2 car lengths (12m) 18m (minimum) Compliant
Provisions
Table 3.2: Design Compliance Summary – Northern Exit-only Access
Design Aspect Council Requirement Proposed Provision Compliance
Distance from an 6m 165m Compliant
intersection
Sight Distance - 69m >120m (minimum) Compliant
50kph
Type Heavy duty in accordance with IPWEA Heavy duty in accordance with Compliant
standard dwg. RD-S-051 IPWEA standard dwg. RD-S-051
Width Adequate for design vehicle swept path 7.0m Compliant
Gradient 1:20 (5%) first 6.85m 1:20 (maximum) Compliant
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 11
3.2 Turn Warrant Assessment
The potential need for turn treatment on Gateway Drive have been assessed in accordance with Austroads
warrants based on the 10-year design horizon peak hour volumes. Table 3.3 summarises the analysis which
indicates that minimum treatments (BAR and BAL) are warranted.
However, due to the proximity of the proposed entry-only access to the existing northern Bunnings site
access, and its channelised right turn treatment, modification of the existing pavement marking on Gateway
Drive is proposed to effectively extend the channelised right turn lane to ensure vehicles turning right into
the proposed site access can do so clear of the northbound through lane. The recommended design is shown
in TTM drawing 21BRT0226-03A (Appendix B).
This proposed arrangement is anticipated to operate safely and efficiently without adversely impacting the
performance of the existing Bunnings site access (refer to Section 7 for detailed analysis).
Table 3.3: Turn Warrant Assessment – Southern Entry-only Access
Peak Left Turn Right Turn
Qm Ql Treatment Qm Qr Treatment
AM 222 2 BAL 467 14 BAR
PM 240 2 BAL 386 14 BAR
SAT 176 3 BAL 339 25 BAR
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 12
4 Car Parking Arrangements 4.1 Parking Supply Acceptable Outcome AO6.1 of Council’s Driveways and Parking Code refers to Table 9.4.1.4 of the code which identifies minimum car parking rates for particular land uses. The applicable rate for ‘Hardware and Trade Supplies’ is a minimum of 1 space per 50m2 of use area. The Hardware and Trade Supplies building area contains a significant proportion of floor space dedicated to the access, circulation and parking of vehicles which results in an effective use area of approximately 1,088m2. Table 4.1 summarises the planning scheme acceptable outcome minimum car parking supply and the proposed supply. As indicated, a minimum of 22 spaces is required including 1 PWD space. A total of 56 spaces are proposed within the lower-level car parking area with an additional 6 parallel light vehicle loading bays within the upper level. The proposed supply satisfies the planning scheme acceptable outcome. Table 4.1: Parking Supply Requirements Land Use Council Requirement Extent Requirement Provision Hardware Trade one space per 50m² of use area 1,088m2 22 56 and supplies 4.2 Car Park Layout Council’s Driveways and Parking Code requires the design and layout of parking areas to be in accordance with the Australian Standards AS2890.1:2004. Table 4.2 identifies the characteristics of the proposed parking area with respect to the standard requirements. The last column identifies the compliance of each design aspect. The layout of the proposed parking areas complies with the standards and is therefore acceptable. The internal layout of both building levels accommodates the swept path requirements of the design vehicle (large car towing dual-axle trailer) as demonstrated in TTM drawing 21BRT0226-04A (Appendix B). Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 13
Table 4.2: Parking Layout Design Compliance
Design Aspect Minimum AS2890.1 Proposed Provision Compliance
Standard
Parking space length:
− Standard bay 5.4m 5.5m Compliant
Parking space width:
− Staff 2.4m 2.6m Compliant
− Visitor 2.6m 2.6m Compliant
− PWD 2.4m + 2.4m ‘shared N/A (not provided)
area’
Aisle Width:
− Parking aisle 6.2m (min) 7.2m (min) Compliant
− 1-way 5.0m (min) 7.2m (min) Compliant
Circulation
Road/ramp
Maximum Gradient:
− PWD parking 1:40 (2.5%) N/A (not provided) Compliant
− Parking bay 1:16 (6.25%) Generally Flat Compliant
− Parking aisle 1:20 (5.0%) Generally Flat Compliant
− Ramp 1:5 (20%) 1:10 (10%) Compliant
Maximum Change in 1:8 (12.5%) summit 1:20 (5%) Compliant
Grade 1:6.67 (15.0%) sag
Height Clearance
− General Min. 2.2m 3.3m Compliant
− Over PWD bay 2.5m 3.3m Compliant
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 14
5 Service Vehicle Arrangements A designated service vehicle area is proposed on the upper level at the rear (eastern end) of the building and is accessed via a 1-way circulation road system. As demonstrated in TTM drawing 21BRT0226-04A (Appendix B) the proposed internal layout adequately accommodates the swept path of the adopted design vehicle (19m articulated vehicle) whilst ensuring that vehicle movements to and from the bulk trade yard internal building area is maintained. All internal onsite design complies with 2890.2-2018 Parking Facilities Part 2 Off-street commercial design and is adequate for the operational requirements of the development. Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 15
6 Active Transport 6.1 Pedestrian Access The proposed development plans provide for a designated site access located immediately south of the Gateway Drive vehicular site access which provides connectivity to a proposed internal path that connects to the main building entry point. 6.2 Cyclist Requirements Acceptable Outcome AO6.1 of Council’s Driveways and Parking Code refers to Table 9.4.1.4 of the code which identifies bicycle parking for Business Activities is to be provided at the rate 1 space per 50m2 up to 500m2 and 1 space per 500m2 in excess of 500m2. Based on the estimate effective use area of 1,088m2 this equates to a requirement of 12 spaces. However, due to the generally bulky nature of goods sold at Hardware and Trade stores customer travel to and from the proposed development is unlikely to be undertaken by bicycle and no customer parking spaces are practically required. Staff demand for bicycle parking is anticipated to be low. Based on an anticipated maximum 10 staff provision of two bicycle parking spaces is considered to be appropriate for the development. Whilst no specific bicycle parking spaces are shown on the development plans, there appears to be adequate space for inclusion of two staff parking spaces to be located outside the main entry of the building. Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 16
7 Traffic Impact Assessment 7.1 Scope Assessment of the potential traffic impacts of the proposed development has been limited to the proposed vehicular site accesses to Gateway Drive and the adjacent existing northern Bunnings vehicular site access. Each site access has been assessed for the 10-year design horizon (2034) traffic demands under the ‘with development’ (project case) scenario. 7.2 Surveyed (2021) Traffic Volumes TTM Data conducted a traffic movement survey at both existing Bunnings customer vehicle site access on Gateway Drive from 6am to 9:30pm on Thursday 17th October 2021 and 6:30am to 9:30pm on Saturday 8th October 2021. The peak hour periods were found to be: • 8:15-9:15am and 2-3pm on the Thursday; and • 10-11am on the Saturday. The surveyed peak hour volumes are presented in Appendix C. 7.3 Background Traffic Growth Potential traffic growth on Gateway Drive is limited due to the closed catchment of industrial land that is serves. The proportion of currently vacant industrial land within the catchment to the north and east of the subject site is in the order of 5%. As such, the ultimate through traffic volumes on Gateway Drive passed the subject site can reasonably be anticipated to be approximately 5% higher than current volumes. For the purpose of this assessment it is conservatively assumed that the ultimate (2034) traffic volumes on Gateway Drive would increase by 10%. The estimated peak hour volumes at 2034 are shown in Appendix C. 7.4 Estimated Development Traffic 7.4.1 Generation The peak traffic generation of the proposed development has been estimated based on traffic generation surveys undertaken on the behalf of the NSW RMS for hardware store developments in NSW. The study indicated the following range of generation rates: • Weekday AM peak hour = 0.6 – 3.9vph / 100m2 GFA; • Weekday PM peak hour = 2.0 – 3.8vph / 100m2 GFA; • Saturday peak hour = 4.3 – 6.7vph / 100m2 GFA. Application of the highest rates in each range to the proposed development results in the estimated peak hour traffic generation summarised in Table 7.1. Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 17
Table 7.1: Estimated Peak Hour Development Traffic Generation
Proposed
Peak Hour Period Gen. Rate Total Trips Trips IN Trips OUT
Area
Weekday AM 3.9 42 50% 21 50% 21
Weekday PM 1,088 m2 3.8 42 50% 21 50% 21
Saturday AM 6.7 73 50% 37 50% 37
7.4.2 Directional Distribution
The directional distribution of above identified additional development traffic is based on the apparent
distribution of traffic to and from the existing Bunnings development as per the traffic movement survey.
The resulting traffic volumes associated with the proposed development are shown in Appendix C.
7.5 Site Accesses Analysis
The existing northern Bunnings site access and the two proposed site accesses have been analysed using SIDRA
9 analysis software for the estimated 10-year design horizon (2034) peak hour volumes with inclusion of the
proposed developments traffic demands. All three site accesses were analysed as a ‘network’ to enable the
potential interaction between the accesses to be modelled and assessed.
Detailed analysis outputs are included in Appendix D and the results are summarised as follows.
7.5.1 Existing Bunnings Northern Access
Table 7.2 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. Importantly, the 95th queue length on the
right turn into the access would not exceed 1 vehicle. This means that shared use of the right turn lane with
the proposed entry-only access is acceptable and would not adversely impact the performance of either
access.
Table 7.2: SIDRA Analysis Summary – Existing Bunnings Northern Access
Peak Period Right Turn from Gateway Drive Exit from Site Access
DoS (%) Avg. Delay 95 th %ile DoS Avg. Delay 95 th %ile
(sec) Queue (m) (sec) Queue (m)
Weekday AM 1.4 6 0.5 2.4 10 0.7
Weekday PM 0.9 6 0.3 1.9 9 0.5
Saturday 1.8 6 0.6 2.8 8 0.7
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 18
7.5.2 Proposed Southern Access (Entry-only)
Table 7.3 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. Importantly, the 95th queue length on the
right turn into the access would not exceed 1 vehicle. As per the existing Bunnings site access analysis this
means that shared use of the right turn lane with the proposed entry-only access is acceptable and would
not adversely impact the performance of either access.
Table 7.3: SIDRA Analysis Summary – Proposed Entry-only Access
Peak Period Right Turn from Gateway Drive
DoS (%) Avg. Delay 95 th %ile
(sec) Queue (m)
Weekday AM 1.5 3 0.5
Weekday PM 1.4 3 0.5
Saturday 2.4 3 0.8
7.5.3 Proposed Northern Access (Exit-only)
Table 7.4 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. The exit movements would operate with
minimal delay and queuing.
Table 7.4: SIDRA Analysis Summary – Proposed Exit-only Access
Peak Period Exit from Site Access
DoS Avg. Delay 95 th %ile
(sec) Queue (m)
Weekday AM 1.9 8 0.5
Weekday PM 1.9 7 0.5
Saturday 3.1 7 0.9
7.6 Conclusion
The analysis indicates that the proposed site accesses would operate with ample spare capacity and would
not adversely impact the operation and performance of the existing Bunnings site access located
immediately south of the subject site.
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
Section 19
8 Summary and Conclusions 8.1 Development Summary The proposed development is for a standalone Hardware and Trade Supplies building to be operated by Bunnings as a bulk trade supplies facility. The proposed building includes two levels; a lower at-grade level containing an on-site car parking area and an upper level containing a drive-through bulk trade supplies area. The upper level has an overall gross floor area of 1,861m2. Accounting for the necessary vehicle and pedestrian circulation areas, the upper level has an effective floor area of approximately 1,088m2. 8.2 Car Parking Arrangements A total of 57 spaces are proposed within the lower-level car parking area with an additional 6 parallel light vehicle loading bays within the upper level. The proposed supply satisfies the planning scheme acceptable outcome of a minimum of 22 spaces. The proposed design of the car parking area is in accordance with AS2890. 8.3 Access Arrangements Two vehicular site accesses to Gateway Drive are proposed including an entry-only access, located adjacent the sites southern boundary, and an exit-only access, located adjacent the northern boundary. Both accesses are designed and located in accordance with Council’s standards. Upgrade works on Gateway Drive are necessary for the proposed entry-only site access including extension of the existing channelised right turn lane at the existing northern Bunnings site access and extension of ‘no stopping’ zones on both sides of the road as indicated in TTM drawing number 21BRT0226-03A (Appendix B). Pedestrian and cyclist site access is proposed to be facilitated by way of a dedicated site access located immediately adjacent the sites southern boundary. 8.4 Service Vehicle Arrangements A designated service vehicle area is proposed at the rear of the building on the upper level. All service vehicles will circulate through the site in a 1-way anti-clockwise direction. The design layout of this area, the site accesses, and internal circulation roadways comply with the relevant design standards and are anticipated to be adequate for the service vehicle demands of the proposed development. 8.5 Active Transport Facilities The current public transport infrastructure is considered adequate for the development. To cater for potential demand for customer and staff cyclists a supply of two (2) parking spaces is considered reasonable. Whilst no Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 20
specific bicycle parking spaces are shown on the development plans, there appears to be adequate space for inclusion of two parking spaces to be located outside the main entry of the building on the lower level. 8.6 Traffic Impact Assessment The proposed development is a low traffic generating land use for which assessment of its potential traffic impacts is limited to its site accesses and the interaction with the existing northern Bunnings site access. The analysis and assessment indicate that all three site accesses would operate with ample spare capacity with no adverse impacts. However, upgrade works are required on Gateway Drive for the proposed entry-only site access including extension of the existing channelised right turn lane at the existing northern Bunnings site access and extension of ‘no stopping’ zones on both sides of the road as indicated in TTM drawing number 21BRT0226-03A (Appendix B). 8.7 Conclusion Based on the assessment contained within this report, TTM see no traffic engineering reason why the relevant approvals should not be granted. Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 21
Appendix A Proposed Development Plans Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD Reference: 21BRT0226
Section 22
THIS DRAWING HAS BEEN CO-ORDINATED DEVELOPMENT SUMMARY
WITH CURRENT DOCUMENTATION FROM :
TOTAL SITE AREA = 2.667ha
SURVEY CIVIL FIRE
HYDRAULIC ELECTRICAL BUNNINGS WAREHOUSE AREAS
MAIN WAREHOUSE = 4,687.33m²
MECHANICAL STRUCTURAL MAIN ENTRY = 70.98m²
CONSULTANTS AT: GOODS INWARDS = INCLm²
D.A. STAGE APPR'D ..... DATE ........ OFFICES & AMENITIES = INCLm²
WAREHOUSE AREA = 4,758.31m²
B.A. STAGE APPR'D ..... DATE ........
TENDER STAGE APPR'D ..... DATE ........ OUTDOOR NURSERY = 818.60m²
BAGGED GOODS CANOPY = 880.70m²
CONST'N STAGE APPR'D ..... DATE ........ NURSERY AREA = 1,699.30m²
TIMBER TRADE SALES = 1,134.67m²
TRADE & YARD AREA = 1,134.67m²
TOTAL AREA - EXISTING = 7,592.28m²
NEW BULK TRADE YARD = 1,860.80m²
(INTERNAL PARKING & MANOEUVRING)= (773.27m²)
2400 HIGH SECURITY FENCE 145.420 188°43'05" 2400 HIGH SECURITY FENCE
EU
TOTAL AREA - PROPOSED = 8,679.81m²
MU
CAR PARKING
PROVIDED
L
L
L
L
L
L
L
L
L
L
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
W W W W H
W W W W W W W W W W W W W W W H
ND
FHR FHR FHR
BUNNINGS TOTAL CAR PARKS - 207 EXISTING
FHR
W
GOODS
W
GOODS INWARDS
RRSD
INWARDS INCLUDING 4 SPACES FOR ACCESSIBLE PARKING
I
RSD
OPY
CAN
GI
AND 7 TRAILER BAYS
NO
ENTRY ONLY
W
1 TROLLEY BAY PROVIDED
GAS
W
CAGE
B
R.S.D FHR
PROPOSED BULK TRADE YARD - 56 PROPOSED
L L
OS
CO CO
W
BUNNINGS TOTAL CAR PARKS - 263 PROPOSED
W
AR
49.
DESIGN VEHICLE
W
622
W
REQUIRED - ARTICULATED VEHICLE
L
OA
CO
L
CO
L
L
CO
CO
PROVIDED - ARTICULATED VEHICLE
252
W
TIMBER TRADE SALES MAIN WAREHOUSE
D
BAGGED
FHR
W
°01
4,687.33 m2
B B
IMPERVIOUS AREA - EXISTING
E.O.D
1,134.67 m2 GOODS
'15"
HARD STAND AREA = 11,493.06m²
W
B B
CANOPY ROOF AREA = 7,349.75m²
W
L
880.71 m2
L
CO
CO
L
L
L
L
L
L
L
W
CO
CO
CO
CO
CO
CO
CO
TOTAL AREA = 18,842.81m²
L
CO
W
69.390 98°46'20"
W
L
CO
L
CO
LANDSCAPED AREA (29.34%) = 7,827.19m²
L
CO
W
W
L
CO
IMPERVIOUS AREA - OVERALL
L
L
L
CO
Section 23
CO
CO
HARD STAND AREA = 13,177.89m²
W
OVER
HEAD
W
BULK
TING
ROOF AREA = 9,487.17m²
EXIS
L
CO
TOTAL AREA = 22,665.06m²
FALL
FALL
FALL
W
W
L
CO
L
CO
LANDSCAPED AREA (15.01%) = 4,004.94m²
L
L
L
CO
CO
CO
B B
E.O.D
W
W
IMPERVIOUS AREA - PROPOSED
B B
FHR
OUTDOOR NURSERY
HARD STAND AREA = 1,684.83m²
FALL
FALL
FALL
EXTENT OF EXPANSION
W
818.55 m2 ROOF AREA = 2,137.42m²
W
B
B
L
L
FHR
CO
CO
L
W
CO
FHR
R.S.D
WW W W W W W W W W W
E.O.D
B
B
TOTAL AREA = 3,822.25m²
L
L
L
L
L
L
L
L
L
L
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
B B
R.S.D
L
L
L
W RSD
CO
CO
CO
W W W W W W W W W W W W W W W W W W W W W
FHR
HW H
B
B
B
B
B
PIC
MAIN ENTRY
K-U
W
B B
P CAN B B
50000
OPY
E.O.D
E.O.D
E.O.D
CAGE
GAS
W B B 70.98 m2 B B
BBQ LANDSCAPED AREA (6.16%) = 250.75m²
CAGE
FALL
FALL
FALL
SITE AREA = 4073.00m²
GAS
300 113
W
50.000 188°53' CONTOUR LEVEL RL 14.000 RL 17.150 W
W W W W DOUBLE SLIDING GATE 4400
W W W W
W W W W
LOT 101
W W W W
2.793ha
7200
FFL - 17M
TROLLEY BAY
14879
NB168
RL 17.000
W
W
8000
W
B · DEVELOPMENT SUMMARY UPDATED GDC 21.03.22
AB OVE A MATERIAL CHANGE OF USE - GDC 25.02.22
DING
BUIL DEVELOPMENT PERMIT APPLICATION
W
8500
DRN
1:20 RAMP
No AMENDMENT DATE
81.445 98°52'30"
10000
CHK
W
TROLLEY BAY
NB168
W
CAD REF: C:\Users\user1\Documents\Group 4 Architects Dropbox\G4AData\21002\DA\DA02-B.dwg
W
7200
TROLLEY BAY
NB168
W
W
7200
GROUP 4
W
ARCHI TECTS
1:10 RAMP
W
28500
Architecture, Project Management,
RAMP UP
Construction, Interior Design
7200 7200 5500 5500 7200 5500 Level 6
W
131 Leichhardt Street
Spring Hill Qld 4000
W
Telephone (07) 3831 5399
Facsimile (07) 3831 5422
4.56%%
4.56
LANDSCAPED FALL
Email [email protected]
W
SIGHT LINE SPLAY TO ACN 072 308 582
ABN 26 072 308 582
TRAFFIC ENGINEERS
W
1:20 RAMP
DETAILS
10000
5000
RAILING FENCE ENCLOSURE
W
PROJECT
BUNNINGS
W
NOOSAVILLE
2.28%%
BIO-RETENTION BASIN
6000
2.28
9657
W
Section 24
CUSTOMER
at
VERGE
CONTOUR LEVEL RL 10.000
5000
RL 10.850 ENTRY/EXIT
CNR EUMUNDI NOOSA ROAD &
(170.102) 8°53'55" GATEWAY DRIVE
NOOSAVILLE, QLD 4566
GATEWAY DRIVE for
NORTH POINT
BUNNINGS GROUP LIMITED
COPYRIGHT © GROUP 4 ARCHITECTS PTY LTD
DRAWING TITLE
SITE PLAN OF LAYOUT
PROPOSED BULK TRADE YARD
GATEWAY DRIVE UNDERCROFT PARKING
DATE SEPTEMBER 2021 PROJECT NO. 21002
DRAWN GDC DRAWING NO.
CHECKED DA02
01 SITE PLAN OF LAYOUT SCALE 1:500 @ A1 ISSUE NO. B
- PROPOSED BULK TRADE YARD 1:500 Document Verification
UNDERCROFT PARKING Conforming
Conforming - Including amendments as noted
Nonconforming - Amendments as noted to be resubmitted
Authority Verification
Verified By: Date:
Form QM114, Revision Date: 30 June 2011
PRELIMINARY
0 25m
ISSUE ALL DIMENSIONS TO BE VERIFIED AND CHECKED ON SITE
USE FIGURED DIMENSIONS IN PREFERENCE TO SCALING
The text continues on section 25.
Used in these records
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.