MOVEMENT SUMMARY
Site: 4 [S1_AM (Site Folder: 2034 Project Case)] Network: N101 [2034 AM
(Network Folder: General)]
Gateway Drive / Existing Bunnings Northern Site Access
2034 Weekday AM Peak Hour (0815-0915)
Site Category: (None)
Give-Way (Two-Way)
Vehicle Movement Performance
Mov Turn DEMAND ARRIVAL Deg. Aver. Level of 95% BACK OF Prop. Effective Aver. No. Aver.
ID FLOWS FLOWS Satn Delay Service QUEUE Que Stop Cycles Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate
veh/h % veh/h % v/c sec veh m km/h
South: Gateway Drive (S)
2 T1 269 5.0 269 5.0 0.138 0.0 LOS A 0.0 0.0 0.00 0.00 0.00 59.9
3 R2 20 5.0 20 5.0 0.014 6.3 LOS A 0.1 0.5 0.34 0.56 0.34 52.1
Approach 289 5.0 289 5.0 0.138 0.5 NA 0.1 0.5 0.02 0.04 0.02 58.8
East: Bunnings Access (E)
4 L2 15 14.0 15 14.0 0.024 6.5 LOS A 0.1 0.7 0.38 0.59 0.38 51.6
6 R2 6 17.0 6 17.0 0.024 10.0 LOS B 0.1 0.7 0.38 0.59 0.38 48.4
Approach 21 14.9 21 14.9 0.024 7.6 LOS A 0.1 0.7 0.38 0.59 0.38 51.0
North: Gateway Drive (N)
7 L2 15 7.0 15 7.0 0.123 2.1 LOS A 0.0 0.0 0.00 0.03 0.00 56.0
8 T1 223 7.0 223 7.0 0.123 0.0 LOS A 0.0 0.0 0.00 0.03 0.00 59.7
Approach 238 7.0 238 7.0 0.123 0.1 NA 0.0 0.0 0.00 0.03 0.00 59.4
All Vehicles 548 6.2 548 6.2 0.138 0.6 NA 0.1 0.7 0.03 0.06 0.03 58.5
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Network Data dialog (Network tab).
Vehicle movement LOS values are based on average delay per movement.
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not
a good LOS measure due to zero delays associated with major road movements.
Delay Model: SIDRA Standard (Geometric Delay is included).
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise | Processed: Tuesday, 22 March 2022 4:29:13 PM
Project: L:\Synergy\Projects\21BRT\21BRT0226 Bunnings Noosaville\6 - Analysis\1-DA\21BRT0226_SA01_B.sip9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.