Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Appendix E - Traffic Impact Assessment · MCU22/0051

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 50, section 1. The text section number identifies this passage in the reader.

Performance outcomes                                      Acceptable Outcomes                                          Response
                                                                    2.   be easily maintained;
                                                                    3.   have a width and longitudinal gradient to
                                                                         cater for projected usage;
                                                                    4.   provide clear sight-lines for safe use; and
                                                                    5.   be free of any obstructions such as
                                                                         fences, signage and bollards

                                                          AO9.8
                                                          Pedestrian routes border the frontages of residential
                                                          land, public parks and business uses with routes through
                                                          parking lots or at the rear of lots avoided.



Road Design and Construction Table 9.4.7.3 Criteria for assessable development (part)

Performance outcomes                                      Acceptable Outcomes                                          Response
Road Design and Construction
PO10                                                      AO10                                                     Complies with PO and AO
Roads and pathways are planned and designed to            Road planning and design is in accordance with Council’s A minor upgrade to pavement marking along the
support the function of the road hierarchy and ensure     Planning Scheme Policy PSP6 Engineering Design           site’s frontage to Gateway Drive is required. Refer
that—                                                     Standards – Roads, drainage and earthworks.              to TTM’s Traffic Engineering Report for details.

         1.   design and alignment of roads,
              intersections and all associated works—

                        1.   convey the primary
                             function of each type of
                             street;
                        2.   provide a safe
                             environment for all users;
                        3.   are adequate for the
                             design speed
                             environment;

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.