Council archive · source document
Appendix E - Traffic Impact Assessment · MCU22/0051
Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 53, section 1. The text section number identifies this passage in the reader.
Performance outcomes Acceptable Outcomes Response
transport, walking, cycling, taxis, and shared and 1. road and pathway networks are designed
private vehicles. for safe pedestrian and cyclist
movements;
2. pathways provide direct pedestrian and
cyclist access to focal points and transit
opportunities;
3. designated bus stops, taxi and shared
vehicle set-down facilities are provided.
AO11.2
On-street parking, drop-off, access to parking and
loading facilities and vehicle manoeuvring do not
compromise walking and cycling safety and amenity.
AO11.3
Roads that function as main streets within an activity
centre are designed to facilitate active frontages through
means such as wide footpaths and slow speed
environments.
AO11.4
Commercial sites fronting main streets, including
Sunshine Beach Road, Poinciana Avenue, Maple Street
and Diamond Street, are provided with access from rear
lanes or other access streets for service vehicles and to
parking areas, to reduce potential conflicts with
pedestrians and cyclists by having driveways to these
streets.
AO11.5
Taxi or shared vehicle infrastructure is provided parallel
to the kerb, conveniently located to minimise passenger
walking and designed in accordance with:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.